Stage tool for wellbore cementing
Abstract
A stage tool and a method for stage cementing a wellbore annulus. The method includes: running into a wellbore toward bottom hole with a tubing string to a position in the wellbore; setting the tubing string in the wellbore to create the wellbore annulus between the tubing string and a wall of the wellbore; opening a cementing port through a side pocket structure positioned alongside the tubing string; pumping cement through the cementing port; and closing the cementing port to hold the cement in the annulus.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 3.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A stage tool for wellbore annular cementing, comprising: a main body including a tubular wall with an outer surface and a longitudinal bore extending from a top end to a bottom end; a side pocket extending adjacent to the tubular wall, the side pocket including an outer wall defining a chamber between the outer wall and the longitudinal bore, the outer wall having an outwardly facing surface; an inner cementing port passing through the tubular wall and, when opened, providing fluidic access between the longitudinal bore and the chamber; an outer cementing port passing through the outer wall an
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (3 of 3 total)
References Cited — Backward Prior Art (50)
Non-Patent Literature (5)
- Davies, Jason et al.; Reverse Circulation of Primary Cementing Jobs-Evaluation and Case History; IADS/SPE Drilling Conference, Dallas, Texas, USA, Mar. 2-4, 2004; IADC/SPE 87197.
- Davies, Jason et al.; Reverse Circulation of Primary Cementing Jobs—Evaluation and Case History; IADS/SPE Drilling Conference, Dallas, Texas, USA, Mar. 2-4, 2004; IADC/SPE 87197.
- Griffith, J. E. et al.; Reverse Circulation of Cement on Primary Jobs Increase Cement Column Height Across Weak Formations; SPE Production Operations Symposium, Oklahama City, OK, USA, Mar. 21-23, 1993; SPE 25440.
- Marquaire, R. et al., Primary Cementing by Reverse Circulation Solves Critical Problem in hte North Hassi-Messaoud Field, Algeria; Journal of Petroleum Technology' Feb. 1966; pp. 146-150; SPE111.
- Marriot, Tim et al.; Revers-Circulation Cementing to Seal a Tight Liner Cap; Offshore Technology Conference, Houston, Texas, USA, Apr. 30-May 3, 2007; OCT 18839.