US 9,853,448 B2#81864208 Most CitedActiveUnited States (USPTO)Utility

Systems and methods for coordinating electrical network optimization

0Forward Citations (#81864208 Global)
0.0/yrCitation Velocity (#81864208 Global)
0.56Citation PageRank (#81864208 Global)
24Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

In one embodiment, a system includes a coordinated distribution optimization (CDO) system. The CDO system includes a processor configured to coordinate execution of a plurality of independent electrical network applications. Each of the plurality of independent electrical network applications is configured to alter one or more operational parameters of a power grid based on one or more respective objectives and based on power grid operational data, and the execution of the plurality of independent electrical network applications is coordinated by the CDO system to block the power grid from entering an abnormal state. The CDO system further comprises a network interface configured to receive the power grid operational data from a controller of the power grid, and wherein the power grid operational data comprises current values for the one or more operational parameters of the power grid.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 24 · Forward citations: 0.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A system, comprising: a controller that is configured to adjust parameters of an electrical network; a processor; and a memory including: a control application that, when executed by the processor, causes the processor to determine at least one operational parameter adjustment; a plurality of optimization applications that, when executed by the processor, cause the processor to determine at least one optimization parameter adjustment, wherein each of the plurality of optimization applications is assigned to one of a plurality of execution priorities; instructions that, when executed by the pro

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (24)

PatentTitleYearCitations
US 6,317,953 B1Vision target based assembly2001105
US 6,614,880 B1Automated telephone line test apparatus with intelligent diagnostic function200317
US 2004158772 A1Value-based transmission asset maintenance management of electric power networks—83
WO 2005/064279 A1Apparatus, system, method and program of determining the parameters of a distributed network—2
US 7,062,831 B2Method for monitoring proper fastening of an article of assembly at more than one location200615
US 2006156157 A1Checkpoint restart system and method—57
WO 2007/087537 A2System and method for grading electricity distribution network feeders susceptible to impending failure—10
US 2007219755 A1System and method for a self-healing grid using demand side management techniques and energy storage—62
US 2009198464 A1System and method for assembly inspection—47
US 2009281674 A1Method and system for managing a power grid—120
US 7,698,010 B2Methods, systems and computer program products for altering video images to aid an operator of a fastener insertion machine20105
US 2011023280 A1Torque monitoring assembly gun with integral vision system—15
US 2011062708 A1Generator control having power grid communications—38
US 2011106321 A1Dynamic distributed power grid control system—268
US 2011282508 A1Generalized grid security framework—189
US 2012029720 A1Dynamic distributed power grid control system—210
US 2012104850 A1Single phase power factor correction system and method—27
US 8,260,452 B2System for reliable collaborative assembly and maintenance of complex systems20128
US 2012265360 A1Method and system for programming and implementing automated fault isolation and restoration using sequential logic—61
US 2012317550 A1Forward post-execution software debugger—9
US 8,401,709 B2Dynamic distributed power grid control system2013100
US 2014129025 A1Assembly task verification method—2
US 8,738,180 B2Robot control during an e-stop event20144
US 9,535,418 B2Computer directed assembly method and system for manufacturing20171

Non-Patent Literature (2)

  • Fan, Hua, et al.; "Collaborative Optimization of Distribution Grid Operation," IEEE, pp. 1-6 (Jan. 18, 2012).
  • Fan, Hua, et al.; "Collaborative Optimization of Distribution Grid Operation," Improving the Grid Reliability and Efficiency; Innovative Smart Grid Technologies, Presentation; IEEE PES, pp. 1-26 (Jan. 18, 2012).