Operation-time calculation device and method for calculating operation time
Abstract
The operation-time calculation device is configured such that the following processes are performed: a process in which operation-data information, work-time information, and operation-time information are stored in a storage unit, an input unit receives from a user parameter input at least including steps to be aggregated, aggregation start time, aggregation finish time, and aggregation unit time period, and a controller sets the aggregation time period on the basis of the parameters that were input; a process for converting total work time of the steps to be aggregated in each aggregation time period and the corresponding operation time using an operation-time conversion coefficient and calculating total operation time of the steps to be aggregated in the aggregation time period; a process for calculating the differential between total work time of the aggregation time period and total operation time; and a process for changing the operation-time conversion coefficient to minimize the differential.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 16 · Forward citations: 0.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
An operation time calculation device using operation result information from a manufacturing floor, the operation time calculation device comprising: a storage unit, an input unit, a control unit, and a display unit, wherein the storage unit stores: operation result information including at least operation process information, start date and time information, and end date and time information about each operation implemented; work time information including at least an assigned process, a date, and a work time per piece of equipment and per worker; and operation time information including at l
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (16)
Non-Patent Literature (4)
- Chen et al., A Time Window Based Approach for Job Shop Scheduling, May 2001, IEEE Proceedings 2001.
- Ferdinand Levy, Adaptation in the Production Process, Apr. 1965, INFORMS, vol. 11 No. 6, pp. B136-B154.
- JP Office Action for Japanese Application No. 2011-264998, dated Jun. 10, 2014.
- P Ji et al., A Genetic Algorithm of determining cycle time for printed circuit board assembly lines, Jan. 2001, European Journal of Operational Research.