Side-well injection and gravity thermal recovery processes
Abstract
Methods and systems relate to recovering hydrocarbons with an injection well placed at a bottom of a reservoir some horizontal distance from a producer, such that the injection well and producer may both be in a common horizontal plane. For some embodiments, the process includes co-injection of steam with a non-condensable gas, such as methane, ethane, propane, carbon dioxide, combustion products and combinations thereof. The non-condensable gas provides additional solution gas drive while the location of the injection well beside, instead of above, the producer increases production time before a steam chamber reaches a top of the reservoir, increasing thermal and recovery efficiency of the process.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 30 · Forward citations: 1.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of producing hydrocarbons, comprising: forming a single well pair comprising: a single horizontal injection well in a formation, wherein the injection well comprises an injector section that extends lengthwise towards horizontal; and a single production well comprising a producer section that extends lengthwise towards horizontal laterally offset and in horizontal alignment with the injector section; introducing steam and a non-condensable gas under reservoir conditions into the formation through the injection well to form a steam-assisted gravity drainage chamber above the injector s
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (1 of 1 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 11,125,063 B2 | Accelerated interval communication using openholes | 2021 | 1 |
References Cited — Backward Prior Art (30)
Non-Patent Literature (1)
- International Search Report (PCT Article 18 and Rules 43 and 44) dated Oct. 18, 2013. Form PCT/ISA/210 (dated Jul. 2009).