Fluid supply to sealed tubulars
Abstract
A Drill-To-The-Limit (DTTL) drilling method variant to Managed Pressure Drilling (MPD) applies constant surface backpressure, whether the mud is circulating (choke valve open) or not (choke valve closed). Because of the constant application of surface backpressure, the DTTL method can use lighter mud weight that still has the cutting carrying ability to keep the borehole clean. The DTTL method identifies the weakest component of the pressure containment system, such as the fracture pressure of the formation or the casing shoe leak off test (LOT). With a higher pressure rated RCD, such as 5,000 psi (34,474 kPa) dynamic or working pressure and 10,000 psi (68,948 kPa) static pressure, the limitation will generally be the fracture pressure of the formation or the LOT. In the DTTL method, since surface backpressure is constantly applied, the pore pressure limitation of the conventional drilling window can be disregarded in developing the fluid and drilling programs.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 3.
Claims (2 — 2 Independent, 0 Dependent)
- Claim 1Independent Claim
An apparatus adapted for sealing a tubular, the apparatus comprising: an inner member with a first sealing element and a second sealing element; the inner member, the tubular, the first sealing element and the second sealing element defining a cavity; and a fluid source configured to communicate with the cavity to provide a predetermined fluid pressure to the cavity.
- Claim 2Independent Claim
An apparatus, comprising: an inner member; a first sealing element configured to sealingly engage a drill string; a second sealing element configured to sealingly engage the drill string; the first and second sealing elements defining opposite ends of a cavity, the cavity being outwardly bounded at least partially by the inner member, and the cavity being inwardly bounded by the drill string; and a fluid source configured to communicate with the cavity to prov
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (3 of 3 total)
References Cited — Backward Prior Art (50)
Non-Patent Literature (5)
- A. Cress, et al.; "History and Development of a Rotating Blowout Preventer", ADC/SPE 23931, dated Feb. 18-21, 1992, 17 pages.
- Graphic: "Rotating Spherical BOP", received Jun. 8, 2016, 1 page.
- Inter-Tech Drilling Solutions Ltd.; "Inter-Tech Drilling Solutions Ltd.'s RBOP Means Safety and Experience for Underbalanced Drilling", brochure, dated 1981, 2 pages.
- Leach, Colin P. et al; "Avoiding Explosive Unloading of Gas in a Deep Water Riser when SOBM is in Use", dated 1988, 9 pages.
- Lopes, Clovis A. et al; "Feasibility Study of a Dual Density Mud System for Deepwater Drilling Operations", Offshore Technology Conference paper No. 8465, dated May 5-8, 1997, 10 pages.