Patents
US 9,816,154 B2#90781503 Most CitedActiveUnited States (USPTO)Utility

Process gas preparation apparatus for an industrial furnace system and an industrial furnace system for gas carburizing and hardening of metal workpieces utilizing same

0Forward Citations (#90781503 Global)
0.0/yrCitation Velocity (#90781503 Global)
0.56Citation PageRank (#90781503 Global)
6Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A process gas preparation device for an industrial furnace system is disclosed. The gas preparation device includes a preparation reactor having a catalyst. A gas feed line and a gas return line are connected between the industrial furnace and the preparation reactor to form a closed loop. A compressor is situated upstream from the preparation reactor in the feed line. The preparation reactor is also connected with supply lines for hydrocarbon gas and air to be supplied to the preparation reactor. The process gas preparation device also includes a control device with which process gas preparation and return can be regulated and controlled. The gas feed line also has a shut-off valve. The control device can check the functional state of the catalyst by measuring the pressure differential across the catalyst and can initiate a burn-out process therein to clear clogging of the catalyst.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 6 · Forward citations: 0.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A process gas preparation device for an industrial heat treating furnace system, said gas preparation device comprising: a preparation reactor that contains a catalyst; a gas feed line connected for conducting spent process gas from a treatment chamber of the industrial furnace system to the preparation reactor; a gas return line for conducting process gas from the preparation reactor back to the treatment chamber; a compressor connected in the gas feed line upstream from the preparation reactor; a hydrocarbon gas supply line and an air supply line connected to the preparation reactor; a shut-

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.