Method of propping agent delivery to the well
Abstract
A method for producing minerals and, more specifically, for producing hydrocarbons, by hydraulic fracturing of the rock, can be used for the optimization of formation fracturing crack processing conditions. The method includes splitting a main stream of a propping agent suspension in a fluid at a mixer output into at least two flows having different volume delivery rates, and comingling the at least two flows before delivering to the hydraulic fracturing zone.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 33 · Forward citations: 0.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A method of modifying a pumping schedule of a fluid for delivery to a well comprising: discharging a fluid from a blender at an initial pumping schedule, the initial pumping schedule comprising alternating discharged batches of fluid without proppant and proppant containing fluid; splitting the fluid discharged from the blender into two or more flows in which each of the two or more flows follows the initial pumping schedule; modifying a volume delivery rate of two or more of the two or more flows; commingling the two or more flows at a point downstream of the blender and upstream of the well
- Claim 2Depends on #1
The method of claim 1 wherein the volume delivery rate is modified by changing a pipeline length of at least o
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.