Patents
US 9,792,155 B2#122971240 Most CitedActiveUnited States (USPTO)Utility

Dynamic job processing based on estimated completion time and specified tolerance time

0Forward Citations (#122971240 Global)
0.0/yrCitation Velocity (#122971240 Global)
0.56Citation PageRank (#122971240 Global)
35Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

The invention provides a system and method for managing clusters of parallel processors for use by groups and individuals requiring supercomputer level computational power. A Beowulf cluster provides supercomputer level processing power. Unlike a traditional Beowulf cluster; however, cluster size in not singular or static. As jobs are received from users/customers, a Resource Management System (RMS) dynamically configures and reconfigures the available nodes in the system into clusters of the appropriate sizes to process the jobs. Depending on the overall size of the system, many users may have simultaneous access to supercomputer level computational processing. Users are preferably billed based on the time for completion with faster times demanding higher fees.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 35 · Forward citations: 0.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A computer-implemented method, comprising: receiving a first job to be processed; receiving a second job to be processed, wherein the second job is received subsequent to receiving the first job; receiving processing information from a pool of processing resources; determining a first dynamic cluster of processing resources from the pool of processing resources available to execute the first job; determining a second dynamic cluster of processing resources from the pool of processing resources available to execute the second job, wherein the second job to be processed by the second dynamic clu

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (35)

PatentTitleYearCitations
US 5,093,912 ADynamic resource pool expansion and contraction in multiprocessing environments19921,592
US 5,103,393 AMethod of dynamically allocating processors in a massively parallel processing system1992102
US 5,165,018 ASelf-configuration of nodes in a distributed message-based operating system1992129
US 5,274,809 ATask execution control method for a multiprocessor system with enhanced post/wait procedure1993139
US 5,379,428 AHardware process scheduler and processor interrupter for parallel processing computer systems1995114
US 5,542,088 AMethod and apparatus for enabling control of task execution1996222
US 5,561,456 AReturn based scheduling to support video-on-demand applications199670
US 5,765,140 ADynamic project management system1998394
US 5,822,531 AMethod and system for dynamically reconfiguring a cluster of computer systems1998254
US 5,826,082 AMethod for reserving resources1998127
US 5,881,284 AMethod of scheduling a job in a clustered computer system and device therefor1999121
US 5,909,544 AAutomated test harness1999139
US 6,097,886 ACluster-based hardware-software co-synthesis of heterogeneous distributed embedded systems200058
US 6,161,151 AObject-oriented global resource conflict resolver formatting resource requirements into a predetermined standard format and iteratively computing a resource assignment for each I/O function200047
US 6,236,656 B1Link-efficiency based scheduling in radio data communications systems2001166
US 2001036191 A1Method and apparatus for a data first optical network—10
US 2001053223 A1Content transaction system and method, and program providing medium therefor—90
US 2002002578 A1Scheduling apparatus performing job scheduling of a parallel computer system—99
US 6,345,287 B1Gang scheduling for resource allocation in a cluster computing environment2002155
US 2002075870 A1Method and apparatus for discovering computer systems in a distributed multi-system cluster—72
US 2002082811 A1Optimization apparatus, system, and method of use and doing business—49
US 6,460,082 B1Management of service-oriented resources across heterogeneous media servers using homogenous service units and service signatures to configure the media servers2002232
US 2002165964 A1Method and apparatus for providing a single system image in a clustered environment—32
US 2002194248 A1Dedicated heterogeneous node scheduling including backfill scheduling—89
US 2002198968 A1Method and apparatus for automatic configuration of a cluster of computers—33
US 6,690,649 B1QoS management apparatus200426
US 6,782,410 B1Method for managing user and server applications in a multiprocessor computer system2004158
US 2004165964 A1Fastening system—14
US 2004193517 A1Device and method for pricing repair services—9
US 2004205414 A1Fault-tolerance framework for an extendable computer architecture—83