US 9,785,904 B2#59474579 Most CitedActiveUnited States (USPTO)Utility

Methods and systems for demonstrating and applying productivity gains

1Forward Citations (#59474579 Global)
0.1/yrCitation Velocity (#44792601 Global)
0.77Citation PageRank (#59474579 Global)
34Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

The difference between estimated costs predicted for performing a first workscope and actual costs for performing the first workscope is determined. The model used to generate the estimated costs is adjusted to compensate for the difference, resulting in an improved model. Before beginning a second scope of work that is comparable to the first workscope, the improved model is used to predict estimated costs and a price for the second workscope. The estimated costs for the second workscope include predicted productivity gains. The price for the second workscope can be reduced relative to the price for the first workscope as a result of the improved model and the predicted productivity gains.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 34 · Forward citations: 1.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A system comprising: a processor; a communication interface in communication with the processor; and a memory in communication with the processor, the memory comprising a prediction tool executed by the processor, the prediction tool including: a cost estimation model configured to generate a predicted cost estimate for performing a first project having a first workscope; and instructions for execution by the processor, the instructions causing the processor to, when executed by the processor: receive, via the communication interface, project data for the first project that includes worker tas

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (1 of 1 total)

References Cited — Backward Prior Art (34)

PatentTitleYearCitations
US 5,189,606 ATotally integrated construction cost estimating, analysis, and reporting system1993599
US 5,880,959 AMethod for computer-aided design of a product or process199944
US 5,918,219 ASystem and method for estimating construction project costs and schedules based on historical data1999347
US 6,256,773 B1System, method and article of manufacture for configuration management in a development architecture framework2001873
US 2002049621 A1Decision dynamics—189
US 2002147681 A1Method of and apparatus for building management, and program product—19
US 2003070157 A1Method and system for estimating software maintenance—107
US 2004044600 A1Cost management for a distributed computing environment—27
US 6,715,130 B1Software requirements metrics and evaluation process2004102
US 6,775,647 B1Method and system for estimating manufacturing costs200492
US 2004199805 A1Repair worker assisting method, repair worker assisting program, repair worker assisting system, and terminal—11
US 2004267595 A1Worker and document management system—447
US 6,865,567 B1Method of generating attribute cardinality maps2005284
US 2005114828 A1Method and structure for efficient assessment and planning of software project efforts involving existing software—59
US 2006041857 A1System and method for software estimation—43
US 2006100919 A1Employee recruiting systems and methods—56
US 2007299698 A1Systems and methods for optimizing a health benefits process—23
US 2008312979 A1Method and system for estimating financial benefits of packaged application service projects—112
US 2009012809 A1System for individual retraining with a savings component—11
US 2009106321 A1Maintaining and Utilizing SQL Execution Plan Histories—51
US 2009157563 A1Systems, methods and computer program products for creating a turnover efficient frontier for an investment portfolio—15
US 2009204551 A1Learning-Based Method for Estimating Costs and Statistics of Complex Operators in Continuous Queries—37
US 2009248462 A1Method, Apparatus And Computer Program Product For Capturing Knowledge During An Issue Resolution Process—2
US 7,676,490 B1Project predictor201030
US 2010174573 A1Rough order of magnitude narrative system—2
US 7,899,721 B2E-commerce system, method and computer program product20115
US 7,949,663 B1Enhanced project predictor201120
US 7,971,180 B2Method and system for evaluating multi-dimensional project plans for implementing packaged software applications201178
US 2011166849 A1Planning and optimizing it transformations—28

Non-Patent Literature (1)

  • Froese Thomas Michael, 1992, Integrated Computer-Aided Project Management Through Standard Object-Oriented Models, Standford University, pp. 1-268.