Methods and systems for demonstrating and applying productivity gains
Abstract
The difference between estimated costs predicted for performing a first workscope and actual costs for performing the first workscope is determined. The model used to generate the estimated costs is adjusted to compensate for the difference, resulting in an improved model. Before beginning a second scope of work that is comparable to the first workscope, the improved model is used to predict estimated costs and a price for the second workscope. The estimated costs for the second workscope include predicted productivity gains. The price for the second workscope can be reduced relative to the price for the first workscope as a result of the improved model and the predicted productivity gains.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 34 · Forward citations: 1.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A system comprising: a processor; a communication interface in communication with the processor; and a memory in communication with the processor, the memory comprising a prediction tool executed by the processor, the prediction tool including: a cost estimation model configured to generate a predicted cost estimate for performing a first project having a first workscope; and instructions for execution by the processor, the instructions causing the processor to, when executed by the processor: receive, via the communication interface, project data for the first project that includes worker tas
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (1 of 1 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 12,217,627 B1 | Apparatus and method for determining action guides | 2025 | 0 |
References Cited — Backward Prior Art (34)
Non-Patent Literature (1)
- Froese Thomas Michael, 1992, Integrated Computer-Aided Project Management Through Standard Object-Oriented Models, Standford University, pp. 1-268.