Business process development and run time tool
Abstract
A process development and run time tool identifies dependent relationships between information sources and processes of an enterprise system at design time. The process development and run time tool determines a business value and business risk for each process and stores this information in an information source and process dependency table. The process development and run time tool determines if a particular information source is a critical business risk and if so adds redundancy for the critical risk information source and/or fault tolerance into the process design. An operating system assembles the dependent processes for run time evaluation. If a dependent information source fails at run time, the process development and run time tool identifies each process within the enterprise system that is dependent upon this failed information source. The process development and run time tool informs all stakeholders that rely on information from the failed information source, then prioritizes the elimination of failed information source defects that exceed a predetermined business risk threshold. The process development and run time tool may terminate at risk business processes that exc
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 21 · Forward citations: 0.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method, comprising: forming at design time, by a process development and run time tool executing on a processor in an information handling system (IHS), a dependency table stored in the IHS that includes a list of information sources with dependent processes, the dependency table further including a list of business values, each business value corresponding to a respective dependent process, the dependency table further including a list of business risks, each business risk corresponding to a respective dependent process, the dependency table further including a respective composite informat
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (21)
Non-Patent Literature (5)
- Elky, "An Introduction to Information System Risk Management," 2006, from Information Security reading Room, SANS Institute.
- Gibb, "A framework for business continuity management," 2006, International Journal of Information Management, vol. 26, pp. 128-141.
- Rud, "Product Metrics for Service-Oriented Infrastructures," 2006, IWSM/MetriKon, pp. 161-174.
- Sayal-"Detecting Time Correlations in Time-Series Data Streams", Technical Report, Intelligent Technologies Enterprise Laboratory HP Laboratories Palo Alto HPL-2004-103, published at www.hpl.hp.com (Jun. 9, 2004).
- Sayal—“Detecting Time Correlations in Time-Series Data Streams”, Technical Report, Intelligent Technologies Enterprise Laboratory HP Laboratories Palo Alto HPL-2004-103, published at www.hpl.hp.com (Jun. 9, 2004).