System and method for planning of demand for power on an electrical power network
Abstract
A system and method for calculating energy to be preceded or delayed through a deactivation of appliance on a power network to reduce a highest threshold of power production required to meet power demand. Predictions of power demand by appliances and the possibility of preceding or delaying such demand away from a time of high power usage allow power use to be shifted away from periods of peak production. Further, such predictions allow more complete use of power once a power generator has been activated.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 16 · Forward citations: 0.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A method of utilizing power of a power generator, comprising: calculating a prediction of power demand on a power network at a plurality of intervals between a predicted time of activation of a first generator and a predicted time of activation of a second generator; selecting a set of power consumption devices that are to be active after a time of activation of said first generator; and activating a plurality of power consumption devices from said set, wherein a sum of power demand from said set of activated power consumption devices plus said predicted power demand at a first of said interva
- Claim 2Depends on #1
The method as in claim 1 , comprising identifying a power consumption device from said set, said identified power consumption device having a flexible activation schedule.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗