Patents
US 9,765,596 B2#25067017 Most CitedActiveUnited States (USPTO)Utility

Engineered LCM design to manage subterranean formation stresses for arresting drilling fluid losses

4Forward Citations (#25067017 Global)
0.4/yrCitation Velocity (#18406864 Global)
1.34Citation PageRank (#27143473 Global)
17Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

Methods for designing lost circulation materials for use in drilling wellbores penetrating subterranean formations may involve inputting a plurality of first inputs into a numerical method, the plurality of first inputs comprising a lost circulation material property input of a first LCM; calculating a plurality of first outputs from the numerical method; inputting a plurality of second inputs into the numerical method, the plurality of second inputs comprising the lost circulation material property input of a second lost circulation material; calculating a plurality of second outputs from the numerical method; comparing the first outputs to the second outputs; and developing a drilling fluid comprising a third lost circulation material based on the comparison of outputs.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 17 · Forward citations: 4.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method comprising: inputting a plurality of first inputs into a numerical method, the plurality of first inputs comprising a lost circulation material property input of a first lost circulation material, wherein the lost circulation material property input is selected from the group consisting of Young's modulus, crush strength, resiliency, cyclic fatigue, shear strength, compressive strength, material reactivity, and any combination thereof; calculating a plurality of first outputs from the numerical method; inputting a plurality of second inputs into the numerical method, the plurality

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (17)

PatentTitleYearCitations
US 5,905,061 AInvert emulsion fluids suitable for drilling1999108
US 5,977,031 AEster based invert emulsion drilling fluids and muds having negative alkalinity1999116
US 6,828,279 B2Biodegradable surfactant for invert emulsion drilling fluid200477
US 6,861,392 B2Compositions for restoring lost circulation200568
US 7,284,611 B2Methods and compositions for controlling lost circulation in subterranean operations200775
US 2008147367 A1Methods for Using High-Yielding Non-Newtonian Fluids for Severe Lost Circulation Prevention—12
US 7,534,745 B2Gelled invert emulsion compositions comprising polyvalent metal salts of an organophosphonic acid ester or an organophosphinic acid and methods of use and manufacture200941
US 7,645,723 B2Method of drilling using invert emulsion drilling fluids201052
US 2010088078 A1Method and apparatus for drilling a probabilistic approach—21
US 7,696,131 B2Diesel oil-based invert emulsion drilling fluids and methods of drilling boreholes201057
US 2010181073 A1Method For Controlling Loss of Drilling Fluid—40
US 2010250204 A1System and method for minimizing lost circulation—10
US 8,043,997 B2Lost circulation material formulation and method of use201129
WO 2012/106348 A2Method of minimizing wellbore instability—10
US 2013143777 A1Method for Strengthening a Wellbore of a Well—25
US 2013204588 A1Modeling fracturing fluid leak-off—43
WO 2015/047389 A1Engineered lcm design to manage subterranean formation stresses for arresting drilling fluid losses—4

Non-Patent Literature (5)

  • Halliburton Brochure "Engineered WellSET™ Treatment Service Helps Prevent Lost Circulation by Strengthening the Wellbore," Baroid Fluid Services, 2007, 2 pages.
  • Halliburton brochure "Wellbore Stress Management™ Service," Baroid Fluid Services, 2006, 2 pages.
  • Halliburton Brochure, Steelseal®: Specialty Lost Circulation Particulate, 2012, 2 pages.
  • International Search Report and Written Opinion for PCT/US2013/062609 dated Jun. 27, 2014, 9 pages.
  • Savari et al., "Wellbore Integrity Management: Dealing with Uncertainties," Society of Petroleum Engineers, 2012, SPE 153359, pp. 1-11.