Hydraulic system for construction machinery
Abstract
Disclosed is a hydraulic system for performing land preparation works by means of a simultaneous boom-up and arm-in operation. The hydraulic system according to the present invention includes: an arm cylinder and a boom cylinder that are connected to first and second hydraulic pumps, respectively; a first boom control valve that is disposed in the discharge flow path of the second hydraulic pump; a second boom control valve that is disposed in the discharge flow path of the first hydraulic pump and causes the working fluid of the first hydraulic pump to converge with the working fluid which is supplied from the second hydraulic pump to the boom cylinder; a first arm control valve that is disposed in the discharge flow path of the first hydraulic pump; a second arm control valve that is disposed in the discharge flow path of the second hydraulic pump and causes the working fluid of the second hydraulic pump to converge with the working fluid which is supplied from the first hydraulic pump to the arm cylinder; a recycle valve that is disposed in the flow path between the working fluid inlet port of the first arm control valve and a hydraulic tank; and a second boom control valve spoo
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 12 · Forward citations: 0.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A hydraulic system for a construction machine comprising: first and second hydraulic pumps P 1 and P 2 and a pilot pump, which are connected to an engine; an arm cylinder connected to a discharge flow path of the first hydraulic pump P 1 ; a boom cylinder connected to a discharge flow path of the second hydraulic pump P 2 ; a first boom control valve installed on an upstream side of the discharge flow path of the second hydraulic pump P 2 and configured to be shifted to control a start, a stop, and a direction change of the boom cylinder; a second boom control valve installed on an upstream
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (12)
Non-Patent Literature (1)
- International Search Report (in Korean and English) and Written Opinion (in Korean) for PCT/KR2012/003992, dated Feb. 1, 2013; ISA/KR.