Trace generation device and working machine
Abstract
In a trace generation device including a trace generation determination unit that outputs a command of trace generation, when a difference of an actual load applied to a bucket and a reference load is equal to or larger than a predetermined value during excavation and a candidate trace generation unit that generates a trace in which a work amount is almost constant, after the command is output, the reference load is an estimated load and the command of the trace generation is output when the difference of the actual load and the estimated load is equal to or larger than the predetermined value during the excavation. As a result, working efficiency can be raised while a trace in which an excavation amount is almost constant is generated.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 13.
Claims (2 — 2 Independent, 0 Dependent)
- Claim 1Independent Claim
A trace generation device comprising: at least one processor for executing stored instructions to: determine whether a difference of an actual load applied to a bucket and a reference load is equal to or larger than a predetermined value during excavation: output a command of trace generation, when the difference is equal to or larger than the predetermined value; and based on the output of the command of trace generation: determine a position of an excavation start point a passage area, and a temporary maximum excavation depth, determine a plurality of candidate traces by applying an excavati
- Claim 2Independent Claim
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗