Method and an arrangement for installing elevator guide rails
Abstract
A method includes plumbing an elevator shaft, installing a lowermost first section of guide rail elements manually to walls of the shaft, arranging an upwards and downwards in the shaft with a first hoist movable lifting frame, arranging an upwards and downwards in the shaft with a second hoist movable installation platform provided with a guide apparatus, an installation apparatus and an alignment tool, drilling holes and fastening support brackets to the walls of the shaft with the installation apparatus, lifting guide rail elements with a third hoist from the lifting frame and guiding said guide rail elements into position with the guide apparatus, joining consecutive guide rail elements with the installation apparatus, and aligning opposite guide rail elements with the alignment tool and locking the support brackets with the installation apparatus.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 16 · Forward citations: 14.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
An arrangement for installing guide rails into an elevator shaft, said arrangement comprising: a first hoist; a lifting frame glidingly supported on counter weight guide rails, arranged to move upwards and downwards in the elevator shaft with the first hoist, and configured to lift guide rail elements from a storage area; a second hoist; a third hoist, separate from the first and second hoists, and configured to lift the guide rail elements from the lifting frame, the third hoist including a gripping member; and an installation platform glidingly supported on car guide rails, and arranged to m
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗