Cascaded model predictive control (MPC) approach for plantwide control and optimization
Abstract
A method includes obtaining a planning model for an industrial facility at a master MPC controller and sending at least one optimization call from the master MPC controller to one or more slave MPC controllers. The method also includes receiving at least one proxy limit value from the slave MPC controller(s) in response to the at least one optimization call. The at least one proxy limit value identifies to what extent one or more process variables controlled by the slave MPC controller(s) are adjustable without violating any process variable constraints. In addition, the method includes performing plantwide optimization at the master MPC controller using the planning model and the at least one proxy limit value. The at least one proxy limit value allows the master MPC controller to honor the process variable constraints of the slave MPC controller(s) during the plantwide optimization.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 46 · Forward citations: 8.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method comprising: obtaining a planning model for an industrial facility at a master model predictive control (MPC) controller; sending at least one optimization call from the master MPC controller to one or more slave MPC controllers; receiving at least one proxy limit value from the one or more slave MPC controllers at the master MPC controller in response to the at least one optimization call, wherein the at least one proxy limit value identifies to what extent one or more process variables controlled by the one or more slave MPC controllers are adjustable without violating any process va
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (8 of 8 total)
References Cited — Backward Prior Art (46)
Non-Patent Literature (5)
- Årzén, Karl-Erik, et al.; "Integrated control and scheduling"; Report ISRN LUTFD2/TFRT-7586-SE; Department of Automatic Control (1999); 52 pages.
- Bodington, C. Edward; "Planning, scheduling, and control integration in the process industries"; New York: McGraw-Hill; Chapter 13; 4 pages.
- Grossmann, et al; "Research challenges in process systems engineering": AlChE Journal 46.9 (2000); 7 pages.
- Harjunkoski, et al.: "Integration of scheduling and control-Theory or practice?"; Computers & Chemical Engineering 33.12 (2009); 10 pages.
- Harjunkoski, et al.: “Integration of scheduling and control—Theory or practice?”; Computers & Chemical Engineering 33.12 (2009); 10 pages.