Patents
US 9,725,985 B2#22448781 Most CitedActiveUnited States (USPTO)Utility

Inflow control device having externally configurable flow ports

5Forward Citations (#22448781 Global)
0.6/yrCitation Velocity (#14460553 Global)
1.11Citation PageRank (#36244702 Global)
50Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A completion joint 100 has a sand control jacket 120 and an inflow control device 130 . The jacket 120 communicates screened fluid with a housing of the inflow control device 130 . The basepipe's flow openings 118 are isolated in the housing from the screened fluid by flow devices 170 . The flow devices 170 are externally accessible on the device's housing to selectively configure the flow devices 170 open or closed.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 5.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A flow control apparatus for a borehole, comprising: a basepipe having a bore for conveying fluid and defining at least one opening for communicating fluid into the bore; at least one flow device disposed on the basepipe and defining a plurality of flow ports, the flow ports communicating fluid from outside the basepipe to the at least one opening defined in the basepipe, each of the flow ports being intersected by a respective one of a plurality of external openings exposed on an exterior of the at least one flow device; a plurality of internal valves, each of the internal valves being select

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (50)

PatentTitleYearCitations
US 3,095,007 AThrough conduit type valve apparatus19639
WO 9,208,875 A2Well completion system—63
EP 0,588,421 A1Method and production pipe in an oil or gas reservoir—31
US 5,435,393 AProcedure and production pipe for production of oil or gas from an oil or gas reservoir1995180
US 5,803,179 AScreened well drainage pipe structure with sealed, variable length labyrinth inlet flow control apparatus1998193
US 6,371,210 B1Flow control apparatus for use in a wellbore2002197
US 2002108755 A1Sand screen with active flow control—50
US 2002157837 A1Flow control apparatus for use in a wellbore—89
US 6,644,412 B2Flow control apparatus for use in a wellbore200392
US 6,715,544 B2Well screen200449
EP 1,407,806 A1Screen with controlled pressure drop—5
US 2004108107 A1Controlled-pressure drop liner—38
US 2004154806 A1Flow control apparatus for use in a wellbore—31
US 6,883,613 B2Flow control apparatus for use in a wellbore200565
WO 2005/071221 A1Completion suspension valve system—6
GB 2,410,762 AFlow control apparatus for use in a wellbore—5
EP 1,672,167 A1Flow control apparatus for use in a wellbore—7
US 2007012453 A1Optical sensor use in alternate path gravel packing with integral zonal isolation—20
US 7,240,739 B2Well fluid control200751
US 2007246212 A1Well screens having distributed flow—50
US 2007246407 A1Inflow control devices for sand control screens—108
GB 2,437,641 AWell screen with varying resistance to flow—6
US 2008041588 A1Inflow Control Device with Fluid Loss and Gas Production Controls—74
US 2008169099 A1Method for Controlling the Flow of Fluid Between a Downhole Formation and a Base Pipe—39
CN 101,255,787 AMethod for controlling the flow of fluid between a downhole formation and a base pipe—12

Non-Patent Literature (5)

  • Aadnoy, Bernt S, "Autonomous Flow Control Valve or "intelligent" ICD," (c) 2008, 9 pages.
  • Baker Hughes, "Equalizer-CF Completion Solution Reduced Pay Zone Losses in Mature Field," obtained from www.bakerhughes.com, (c) 2010, 1 page.
  • Birchenko, Vasily Mihailovich, "Analytical Modelling of Wells with Inflow Control Devices," Jul. 2010, pp. 1-134, Institute of Petroleum Engineering Heriot-Watt University.
  • Cesari, Michele, "Water/Gas Breakthrough in Horizontal Wells Analysis of the completion strategies used to mitigate the problem," Master in Petroleum Engineering Sep. 2008, Oct. 21, 2009, 43 pages.
  • Examination Report in counterpart Singapore Appl. 2013040282, dated Aug. 2, 2015.