Determining whether a wellbore sealing operation has been performed correctly
Abstract
The invention relates to methods of determining whether a wellbore sealing operation has been performed correctly, and to wellbore-lining tubing which facilitates the determination of whether a wellbore sealing operation has been performed correctly. The invention has a utility in determining whether cement has been correctly supplied into an annular region defined between an internal wall of a wellbore and an external surface of a wellbore-lining tubing located in the wellbore, or whether a packer has been properly set to seal such an annular region. One disclosed method comprises the steps of: locating a wellbore-lining tubing ( 140 ) in a wellbore ( 100 ), said tubing having at least one pressure sensor ( 80 ); performing a wellbore sealing operation in an annular region ( 178 ) defined between an external surface of said tubing and an internal surface ( 130 ) of a wall of the wellbore, or between an external surface of said tubing and an internal surface of another wellbore-lining tubing ( 118 ) in which said tubing is located, to seal said tubing in the wellbore; monitoring the pressure of fluid in the annular region using the at least one pressure sensor; and recovering data
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 15 · Forward citations: 4.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method comprising: locating a first wellbore-lining tubing in a wellbore, the first wellbore-lining tubing including a tubing wall having internal and external surfaces and at least one pressure sensor positioned in the internal or external surface of the tubing wall and exposed to an annular space defined between (1) the first wellbore-lining tubing and the wellbore or (2) the first wellbore-lining tubing and a second wellbore-lining tubing disposed between the wellbore and the first wellbore-lining tubing; performing a wellbore sealing operation that includes supplying a cement slurry into
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (4 of 4 total)
References Cited — Backward Prior Art (15)
Non-Patent Literature (3)
- COOKE C. E., KLUCK M. P., MEDRANO R.: "FIELD MEASUREMENTS OF ANNULAR PRESSURE AND TEMPERATURE DURING PRIMARY CEMENTING.", JOURNAL OF PETROLEUM TECHNOLOGY., SOCIETY OF PETROLEUM ENGINEERS, US, 1 August 1983 (1983-08-01), US, pages 1429 - 1438., XP002050239, ISSN: 0149-2136
- Cooke et al., "Field Measurements of Annular Pressure and Temperature During Primary Cementing," Journal of Petroleum Technology, AIME, Dallas, TX, 1983, pp. 1429-1438, XP002050239.
- Official Action for Colombian Patent Application No. 13-270.444 dated Dec. 10, 2014.