Pour stop anchor apparatus and system
Abstract
Apparatus are provided for a curtain wall anchor system. The curtain wall anchor assembly may include various anchor configurations. Each anchor embodiment is intended to reduce labor time and costs and eliminate extraneous steps in the construction process involving curtain walls. Each possible anchor assembly also features an optional component of attaching a concrete anchor for optimizing load paths and solving issues of bending in traditional edge angle pour stops.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 19 · Forward citations: 5.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A pour stop with an integral anchor, the pour stop anchor comprising: an upper vertical wall member separated from a lower vertical wall member by a slot; wherein a reinforcing member passes into the slot and a hook member at a first end of the reinforcing member retains the reinforcing member in position preventing slippage out of the slot, the reinforcing member and the lower vertical wall member embedded within a concrete slab a descending flange and the upper vertical wall member separated by an anchor channel with a rear wall, the anchor channel integral with and extending the full length
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗