Method for producing a precast concrete segment of a wind turbine tower, and a precast concrete tower segment formwork
Abstract
A method for producing a precast concrete tower segment of a wind turbine tower is provided. An inner formwork having at least one bore and at least one holding unit on an inner side of the inner formwork in the region of the bore is placed. A first end of a concrete anchor or a first end of a removable element at the first end of the concrete anchor is introduced from the outer side of the inner formwork through the bore into the holding unit in order to hold the concrete anchor. An outer formwork is placed. Concrete is introduced between the inner and outer formwork. The removable element in the first end or the first end of the concrete anchor is removed and the precast concrete segment is removed.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 38 · Forward citations: 2.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method comprising: producing a precast concrete tower segment of a wind turbine tower, wherein producing comprises: providing an inner formwork having a bore and a holding unit at an inner side of the inner formwork in a region of the bore; introducing a first end of a concrete anchor through the bore and into the holding unit in a first direction, wherein the holding unit holds the concrete anchor, wherein the holding unit is designed so that the first end of the concrete anchor can be introduced in the first direction and blocked in a second direction that is opposite the first direction,
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗