Patents
US 9,703,666 B2#62047406 Most CitedActiveUnited States (USPTO)Utility

Method, apparatus and software for managing the generation of process events by a software process

1Forward Citations (#62047406 Global)
0.1/yrCitation Velocity (#44930439 Global)
0.74Citation PageRank (#62047406 Global)
23Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A method, apparatus and software is disclosed for managing the generation of process events generated by a software process for supply to a process monitoring system, in which the generation of process events can be enabled or disabled on a group basis.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 23 · Forward citations: 1.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method for managing a generation of process events by a software process for supply to a process monitoring system comprising a client computer and a server computer, said method comprising the steps of: collecting, by a processor of the server computer, process events generated by the software process; storing, by the processor of the server computer, the collected process events in an event store; retrieving from the event store, by the processor of the server computer, requested process events that are used by the client computer of the process monitoring system; building, by the processo

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (1 of 1 total)

References Cited — Backward Prior Art (23)

PatentTitleYearCitations
US 2002073195 A1Method and system for machine-aided rule construction for event management—88
US 6,467,052 B1Method and apparatus for analyzing performance of data processing system2002291
US 6,490,574 B1Method and system for managing rules and events in a multi-user intelligent agent environment200275
US 6,697,791 B2System and method for systematic construction of correlation rules for event management200451
US 2004083013 A1Method of operating a plant and a control system for controlling the same—11
US 6,829,632 B1Apparatus, method and computer program product for client/server computing with timing of creation of coordinator transaction state object being based on triggering events20042
US 2005091640 A1Rules definition language—94
US 2005125809 A1Apparatus, methods and computer programs for monitoring processing in a data processing system or network—18
US 6,948,175 B1Method and system of remote diagnostic, control and information collection using a dynamic linked library200523
US 2006004597 A1Method and system for grouping events—22
US 2006106626 A1Method and apparatus of model driven business solution monitoring and control—180
EP 1,674,988 A2A monitor for an information technology system—2
US 2006150155 A1Monitor for an information technology system—13
US 7,103,874 B2Model-based management of computer systems and distributed applications2006187
US 2006259163 A1Temporary expanding integrated monitoring network—147
US 7,155,641 B2System and method for monitoring the performance of a server200619
US 7,313,447 B2Temporary expanding integrated monitoring network200746
US 7,321,992 B1Reducing application downtime in a cluster using user-defined rules for proactive failover200847
US 7,496,799 B2System and method for monitoring the performance of a server200925
US 7,818,754 B2Operating system event tracking and logging201011
US 7,904,889 B2Business process model debugger201111
US 7,941,454 B2Apparatus, methods and computer programs for monitoring processing in a data processing system or network20117
US 8,886,549 B2Incremental, real-time computation of aggregate expressions20144

Non-Patent Literature (5)

  • Fu, S., et al., "An Intelligent Event Adaptaion Mechanism for Business Performance Monitoring", Proceedings of the IEEE Internation Conference on e-Business Engineering [online], 2005, [retrieved Feb. 14, 2012], Retrieved from Internet: <http://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=155294
  • Sachdeva, N., et al., "On Demand Business Process Life Cycle, Part 8: Business Process Monitoring-Creating Key Performance Indicators," IBM DeveloperWorks [online], 2005 [retrieved Jul. 21, 2012], Retrieved from Internet: <http://www.ibm.com/developerworks/webservices/library/ws-odbp8/>, pp. 1-16.
  • Sachdeva, N., et al., “On Demand Business Process Life Cycle, Part 8: Business Process Monitoring—Creating Key Performance Indicators,” IBM DeveloperWorks [online], 2005 [retrieved Jul. 21, 2012], Retrieved from Internet: <http://www.ibm.com/developerworks/webservices/library/ws-odbp8/>, pp. 1-16.
  • Stuart, I., et al., Oracle® BPEL Process Analytics User's Guide, Oracle [online], 2005 [retrieved Mar. 30, 2016], Retrieved from Internet: <URL: https://docs.oracle.com/cd/B14099-19/integrate.1012/b15597.pdf>, pp. i-xi, 1-1-1-14, 6-1-6-19, 9-1-9-18.
  • Stuart, I., et al., Oracle® BPEL Process Analytics User's Guide, Oracle [online], 2005 [retrieved Mar. 30, 2016], Retrieved from Internet: <URL: https://docs.oracle.com/cd/B14099—19/integrate.1012/b15597.pdf>, pp. i-xi, 1-1-1-14, 6-1-6-19, 9-1-9-18.