Method and apparatus to change generator start delay and runtime following outage
Abstract
A system for providing backup power to a facility includes a generator, and a controller configured to determine whether electrical power to the facility has been interrupted, determine a mode of operation based on a type of occupancy currently within the facility, and if electrical power has been interrupted, then operate the generator based on the determined mode.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 15 · Forward citations: 0.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A system for providing backup power to a facility, comprising: a generator; a controller configured to: determine whether electrical power from a utility supply to the facility has been interrupted; determine a mode of operation based on a type of occupancy currently within the facility; and if electrical power has been interrupted, then operate the generator based on the determined mode; and an automatic transfer switch positioned within the facility and coupled to the controller, the automatic transfer switch having a programmable module that is programmed to: 1) automatically power up the g
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (15)
Non-Patent Literature (1)
- International Search Report dated Feb. 11, 2015 in related matter PCT/IB2014/065515.