Systems and methods for controlling a central plant for a building
Abstract
Systems and methods for controlling a central plant for a building are provided. The central plant has a plant load. An optimal combination of plant equipment for meeting the plant load is estimated. Estimating the optimal combination of plant equipment includes using binary optimization to determine at least two potential combinations of plant equipment. Estimating the optimal combination of plant equipment also includes using nonlinear optimization to determine a potential power consumption minimum for each of the at least two potential combinations. The central plant is controlled according to the estimated optimal combination of plant equipment.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 8.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A computerized method for controlling a central plant for a building, the central plant having a plant load, the method comprising: estimating an optimal combination of plant equipment for meeting the plant load, wherein estimating the optimal combination of plant equipment comprises using binary optimization to determine at least two potential combinations of plant equipment and using nonlinear optimization to determine a potential power consumption minimum for each of the at least two potential combinations; and controlling the central plant according to the estimated optimal combination of
- Claim 2Depends on #1
The method of claim 1 , wherein using binary optimization comprises: identifying a first combination of devices to be turned; and identifying at least a second combination of devices to be turned on, wherein each
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗