Tower assembly and method for assembling tower structure
Abstract
A structure including at least two structural components arranged to form a channel therebetween, a post tensioning element configured to compress the at least two elements with respect to each other, and a thixotropic filler material located within the channel.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 34 · Forward citations: 5.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A structure comprising: at least two structural components arranged to form a channel therebetween, each structural component including a shear key extending into the channel and a conduit separate from the channel; a post tensioning element configured to compress the at least two elements with respect to each other, the post tensioning element including a tendon that runs through the conduit in each structural component and extends outside of each structural component such that the post tensioning element can be externally tensioned, each conduit surrounding and enclosing a portion of the ten
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (5 of 5 total)
References Cited — Backward Prior Art (34)
Non-Patent Literature (3)
- PCT Search Report for PCT/US2014/014771 dated May 21, 2014.
- PCT Written Opinion for PCT/US2014/014771 dated May 21, 2014.
- Schokker et al. Simulated Field Testing of High Performance Grouts for Post-Tensioning. Journal of Bridge Engineering. Mar. 2002. vol. 7, Issue 2. pp. 1-3.