Abstract

The present disclosure provides an artificial dam of a distributed coal mine underground reservoir and its constructing method. The artificial dam comprises a support layer ( 10 ), an anti-seepage layer ( 20 ), and a concrete structure layer ( 30 ) that are successively formed in an auxiliary roadway ( 1 ) from inside to outside, the concrete structure layer ( 30 ) being embedded into a security coal pillar ( 2 ) and/or surrounding rock ( 3 ) around the auxiliary roadway ( 1 ). Because the concrete structure layer ( 30 ) is embedded into the security coal pillar ( 2 ) and/or the surrounding rock ( 3 ) around the auxiliary roadway ( 1 ), the artificial dam is combined to the security coal pillar ( 2 ) to together form a dam for an underground reservoir. Due to multi-layer design, anti-seepage performance and structural strength of the dam can meet the water storage requirements of the underground reservoir.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 29 · Forward citations: 0.

Claims (2 — 1 Independent, 1 Dependent)

  1. Claim 1Independent Claim

    An artificial dam of distributed coal mine underground reservoir, wherein the artificial dam comprises a support layer, an anti-seepage layer, and a concrete structure layer, which are successively formed in an auxiliary roadway from inside to outside, wherein the concrete structure layer is embedded into security coal pillars and/or surrounding rocks around the auxiliary roadway, emergency-observing holes being provided in the support layer, the anti-seepage layer, and the concrete structure layer, the anti-seepage layer being formed from at least one of gangue and loess, the anti-seepage lay

  2. Claim 2Depends on #1

    The artificial dam according to claim 1 , where

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (29)

PatentTitleYearCitations
GB 191,310,483 AImprovements in Dams for Mines and other Places.19132
US 3,396,539 AVapor barrier means for underground storage system19688
US 3,469,405 AMine water barrier196912
US 3,583,165 AMethod for sealing off passageways197115
EP 0,416,440 A1Device for packaging parallelepipedic articles—7
US 4,102,138 AMethod for closing off a mine gallery especially for use to prevent spreading of underground explosions197838
SU 726,349 A1Mine partition19804
SU 840,411 A1Hydraulic insulation partition19814
US 4,315,657 AGas seal for an in situ oil shale retort and method of forming thermal barrier198215
DE 3,147,639 A1Device for barriers of underground gas reservoirs—4
US 4,712,945 ASystem for sealing barrier constructions in subterranean galleries19877
US 4,784,522 AMethod and apparatus for effecting high pressure isolation of liquids19889
US 4,818,144 AFlood isolation dam198915
JP H07156992 AUnderground reservoir—10
US 5,782,539 AWall-to-wall surface mining process199869
US 6,082,828 AMine gallery curtain and method200025
RU 2,219,350 C1Mine hydraulic insulation bridge20038
CN 2,918,533 YEmbankment seepage preventing structure200711
EA 200,802,025 A1Шахтная гидроизоляционная перемычка—2
US 2011013991 A1Mine seal with adhesive—16
CN 202,047,397 USeepage-proofing system for plain artificial dam20116
CN 102,661,169 AGob-side entry retaining method for anchor bolt network gangue bag wall body for coal mining without pillars—25
CN 102,767,302 ADistributed underground reservoir and construction method thereof—43
US 8,342,776 B2Mine seal with adhesive20133
CN 103,422,886 AArtificial retaining dam for coal mine distributed underground reservoir and damming method thereof—31
CN 203,412,696 UWind collection axial-flow type wind power generation device20146
CN 203,412,629 UArtificial retaining dam of coal mine distributed type underground water reservoir201412
US 8,777,522 B2Mine seal with multiple mortared walls20146
CN 105,421,161 AEmbankment structure capable of preventing loess embankment from wetting deformation—4

Non-Patent Literature (2)

  • International Search Report of International Application No. PCT/CN2014/075083, Jul. 9, 2014, 4 pages.
  • Office Action of Russian Patent Application No. 2016103785/03 (005989), Jul. 1, 2016, 6 pages.