Project scheduling and management system that uses product data with product classes
Abstract
Systems and methods of the present disclosure facilitate scheduling and managing a project. In some embodiments, the system includes a quoting module, a product data module, and a project planning module executing on at least one processor of a server. The product data module may be configured to store at least one product. The product stored in the project module may have a product class indicating that the product is a labor product, parts product, or agreements product. The system may be configured to copy products from the product data module to the quoting module. The system may be configured to also copy products from the product data module to the project planning module, and generate tasks for the project planning module based on the products.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 0.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A non-transitory computer readable storage medium comprising instructions for automatically scheduling and managing projects, the instructions comprising instructions to: receive, by a quoting application programming interface (“API”) library executed by one or more processors of a server, a first data record comprising a quote for an agreement product in a first format from a quoting module; translate, via the quoting API library, the agreement product in the quote to a second data record comprising the agreement product in a second format for storage in a product data module, the product dat
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (50)
Non-Patent Literature (5)
- Akintoye, Akintola, Just-in-Time application and implementation for building material management Construction Management and Economics, vol. 13, 1995.
- Aquilano, Nicholas J. et al., A Formal Set of Algorithms for Project Scheduling With Critical Path Scheduling / Materials Requirements Planning, Journal of Operations Research, vol. 1, No. 2, 1980.
- Berka, John H. et al., Materials Management: A Comprehensive System Transactions of AACE International, 1994.
- Connectwise, Inc., ConnectWise Documentation v2011.3, Product Search and Products Screen, Mar. 2012, Tampa, Florida.
- Connectwise, Inc., ConnectWise Documentation v2011.3, References Tab, Jun. 2011, Tampa, Florida.