Minimum duty cycle control for active snubber
Abstract
This application provides methods and apparatus for controlling aspects of a synchronous rectifier power converter. In an example, an apparatus can include a minimum duty cycle control circuit configured to receive first control signals for one or more switches associated with the synchronous rectifier power converter, to compare a duty cycle of the first control signals to a minimum duty cycle threshold, and to provide second control signals having at least the minimum duty cycle for an active snubber switch of the synchronous rectifier power converter.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 19 · Forward citations: 2.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
An apparatus for a synchronous rectifier power converter, the apparatus comprising: a minimum duty cycle control circuit configured to receive first control signals for one or more switches associated with the synchronous rectifier power converter, to compare a duty cycle of the first control signals to a minimum duty cycle threshold, and to provide second control signals having at least the minimum duty cycle for an active snubber switch of the synchronous rectifier power converter.
- Claim 2Depends on #1
The apparatus of claim 1 including a control signal generator configured to provide the first control signals.
- Claim 3Depends on #2
The apparatus of claim 2 , wherein the control signal generator is configured to provide the first control signals to couple to one or more primary side transistors of the synchronous rectifier power conve
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (2 of 2 total)
References Cited — Backward Prior Art (19)
Non-Patent Literature (1)
- Search report from STIC EIC 2800 searcher John DiGeronimo.