Diverting system
Abstract
A diverting system includes, a first tubular, a second tubular receptive to the first tubular having at least one lateral extending therefrom, the first tubular is runnable into the second tubular as well as into the at least one lateral, an engaging device in operable communication with both the first tubular and the second tubular, and a diverting tool in operable communication with the engaging device configured to selectively divert the first tubular into the at least one lateral.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 39 · Forward citations: 0.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A diverting system, comprising: a first tubular; a second tubular receptive to the first tubular being run thereinto and having at least one lateral wellbore extending therefrom, the first tubular being runnable into the second tubular as well as into the at least one lateral wellbore; an engaging device mounted to the first tubular for running and in operable communication with both the first tubular and the second tubular; and a diverting tool mounted to the first tubular for running and in operable communication with the engaging device configured to selectively divert the first tubular int
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (39)
Non-Patent Literature (4)
- A.M. Pasicznyk et al., "Case History of the World's First Level 5 Multilateral Completed from a Semisubmersible Rig"; Society of Petroleum Engineers, SPE Paper No. 56779; Oct. 3-6, 1999; 14 pages.
- Erick Peterson et al., "Development and Installation of an Extended Reach Multilateral Junction"; Society of Petroleum Engineers, SPE/IADC Paper No. 119553; Mar. 17-19, 2009; 14 pages.
- William Clifford Hogg et al., "A New Low Risk Technique of Forming A Level 6 (TAML) Multilateral Junction"; Society of Petroleum Engineers, SPE Paper No. 50664; Oct. 20-22, 1998; 11 pages.
- William S. Isaacson et al., "Level 5 Multilateral Completed on Alaska's North Slope: A Case History"; Society of Petroleum Engineers, SPE/IADC Paper No. 52869; Mar. 9-11, 1999; 13 pages.