Determining a limit of failure in a wellbore wall
Abstract
A method to determine a drilling fluid density limit involves obtaining a geomechanical model of a target borehole, generating a depth of damage model of the target borehole to describe a relationship between a drilling fluid pressure and a depth of damage representing a modeled amount of yielded rock surrounding the target borehole, where the modeled amount of the yielded rock is calculated using a stress model according to a pre-determined failure criterion, and calculating, using the depth of damage model and the geomechanical model, the drilling fluid density limit as a function of the subterranean formation depth, where the drilling fluid density limit maintains the depth of damage at a target level for the target borehole, where the drilling fluid density limit corresponds to a depth gradient of the drilling fluid pressure, where the target borehole is drilled based at least on the drilling fluid density limit.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 24 · Forward citations: 5.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method to determine a drilling fluid density limit for maintaining a target amount of rock failure in a drilling operation, comprising: obtaining a geomechanical model of a portion of a subterranean formation traversed by a target borehole, wherein the geomechanical model comprises a formation pressure dependent on subterranean formation depth; generating, by a computer processor using a stress model dependent on the formation pressure, a depth of damage model of the target borehole based at least in part on a yield factor, wherein the depth of damage model describes a relationship between a
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (5 of 5 total)
References Cited — Backward Prior Art (24)
Non-Patent Literature (5)
- Bradford, et al., "When Rock Mechanics Met Drilling: Effective Implementation of Real-Time Wellbore Stability Control, " IADC/SPE 59121, Feb. 23-25, 2000, 13 pp.
- Chenevert, et al., Shale Swelling at Elevated Temperature and Pressure, Proc. 33rd U.S. Rock Mechanics Symposium, Santa Fe, USA, 1992, pp. 869-878.
- European Examination Report for corresponding European Application Serial No. EP13777709.0, dated Dec. 14, 2015, 7 pp.
- Fjær et al.("Petroleum Related Rock Mechanics", Elsevier B.V., 2008, pp. 1-485).
- Frink et al.("Managed pressure drilling-what's in a name?", Drilling Contractor, 2006).