Patents
US 9,645,853 B2#61379594 Most CitedActiveUnited States (USPTO)Utility

Method and apparatus implemented in processors for real-time scheduling and task organization based on response time order of magnitude

1Forward Citations (#61379594 Global)
0.1/yrCitation Velocity (#44893051 Global)
0.75Citation PageRank (#61379594 Global)
17Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A task scheduling method is disclosed, where each processor core is programmed with a short list of priorities, each associated with a minimum response time. The minimum response times for adjacent priorities are different by at least one order of magnitude. Each process is assigned a priority based on how its expected response time compares with the minimum response times of the priorities. Lower priorities may be assigned a timeslice period that is a fraction of the minimum response time. Also disclosed is a task division method of dividing a complex task into multiple tasks is; one of the tasks is an input gathering authority task having a higher priority, and it provides inputs to the other tasks which have a lower priority. A method that permits orderly shutdown or scaling back of task activities in case of resource emergencies is also described.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 17 · Forward citations: 1.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method of a responsive hardware device implemented in a processor having one or more logical cores for programming a major task, comprising: receiving the major task, wherein the major task has a defined response time requirement requires certain output within a certain time after the arrival of the last of certain input necessary to generate the output; subdividing the major task into one first task and one or more second tasks, the first task having a higher priority than the one or more second tasks, the first task having an associated first response time requirement, each second task def

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (1 of 1 total)

References Cited — Backward Prior Art (17)

PatentTitleYearCitations
US 4,323,142 ADynamically reevaluated elevator call assignments198233
US 4,742,335 ASequential and/or random polling system with virtually instantaneous response time198853
US 5,247,675 APreemptive and non-preemptive scheduling and execution of program threads in a multitasking operating system1993157
US 5,504,894 AWorkload manager for achieving transaction class response time goals in a multiprocessing system1996384
US 5,659,759 AData processing device having improved interrupt controller to process interrupts of different priority levels199748
US 5,887,191 ASystem and method for bounding response time jitter for high priority commands in a multimedia datastreaming system199918
US 5,946,466 ASystem and method for deterministic response to audio/video commands in a multimedia system199912
US 6,421,702 B1Interrupt driven isochronous task scheduler system200233
US 6,757,897 B1Apparatus and methods for scheduling and performing tasks2004253
US 6,894,603 B2Packet communication method of powerline communication system20055
US 7,054,931 B1System and method for intelligent load distribution to minimize response time for web content access200625
US 7,107,590 B2Method of and system for determining a best-case response time of a periodic task200612
US 7,171,479 B2Efficient delivery of boot code images from a network server200744
US 7,293,136 B1Management of two-queue request structure for quality of service in disk storage systems200719
US 7,512,718 B2Reconfigurable computing array without chassis20093
US 2010077399 A1Methods and Systems for Allocating Interrupts In A Multithreaded Processor—27
US 7,822,882 B2Reconfigurable computing array without chassis20103

Non-Patent Literature (5)

  • International Search Report in counterpart PCT application No. PCT/US2013/063591, dated Jun. 17, 2014.
  • May, "Re: Programming prioritisation", Oct. 1, 2012, http://occam-pi.org/list-archives/occam-com/maillist.html, 6 pages, printed from the internet.
  • Verhulst, "RE: Occam-Tau-The natural successor to Occam-Pi - or is there one already?", Oct. 3, 2012, http://occam-pi.org/list-archives/occam-com/maillist.html, 4 pages, printed from the internet.
  • Verhulst, “RE: Occam-Tau—The natural successor to Occam-Pi - or is there one already?”, Oct. 3, 2012, http://occam-pi.org/list-archives/occam-com/maillist.html, 4 pages, printed from the internet.
  • Welch, "Graceful Termination-Graceful Resetting", OUG-10: Applying Transputer Based Parallel Machines, pp. 310-317, 1989.