Patents
US 9,645,848 B2#20069471 Most CitedActiveUnited States (USPTO)Utility

Scheduling homogeneous and heterogeneous workloads with runtime elasticity in a parallel processing environment

5Forward Citations (#20069471 Global)
0.6/yrCitation Velocity (#14301616 Global)
1.69Citation PageRank (#18943782 Global)
9Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

Systems and methods are provided for scheduling homogeneous workloads including batch jobs, and heterogeneous workloads including batch and dedicated jobs, with run-time elasticity wherein resource requirements for a given job can change during run-time execution of the job.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 9 · Forward citations: 5.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method for scheduling jobs in a HPC (high-performance computing) system, comprising: maintaining a batch jobs queue comprising batch jobs, wherein each batch job in the batch jobs queue has a plurality of parameters associated therewith, the parameters comprising a first parameter that denotes a number of processors of the HPC system that are required to execute the batch job, a second parameter that denotes a user-estimated execution time of the batch job, and a third parameter that specifies a number of scheduling cycles that the batch job was skipped and not scheduled; initiating a schedu

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (5)

  • "Parallel Workloads Archive,".cs.huji.ac.il/labs/parallel/workload/, Dec. 2005, 2 pages.
  • A.W. Mu'Alem et al., "Utilization, Predictability, Workloads, and User Runtime Estimates in Scheduling the IBM SP2 with Backfilling," IEEE Transactions on Parallel and Distributed Systems, Jun. 2001, pp. 529-543, vol. 12, No. 6.
  • B. Sharma et al., "HybridMR: A Hierarchical MapReduce Scheduler for Hybrid Data Centers,".cse.psu.edu/research/publications/tech-reports/2012/CSE-%2012-007%20tech-report.pdf, Penn State University, Technical Report CSE-12-007, Dec. 2012, 10 pages.
  • C. Sosa et al., "IBM System Blue Gene Solution: Blue Gene/P Application Development," IBM International Technical Support Organization, redbooks.ibm.com/redbooks/pdfs/sg247287.pdf, Aug. 2009, 406 pages.
  • D. Klusá{hacek over (c)}ek et al., "Alea 2-Job Scheduling Simulator," Proceedings of the 3rd International Conference on Simulation Tools and Techniques (ICST) (SIMUTools), Mar. 2010, 10 pages, Torremolinos, Malaga, Spain.