Patents
US 9,632,011 B2#44947043 Most CitedActiveUnited States (USPTO)Utility

System and method for testing a gas turbine

2Forward Citations (#44947043 Global)
0.2/yrCitation Velocity (#31887733 Global)
0.88Citation PageRank (#48963747 Global)
18Prior Art Cited
3Claims (1 Indep. · 2 Dep.)
0Drawings / Sheets

Abstract

A method of testing a gas turbine is provided. The gas turbine includes a first compressor and an expansion turbine coupled by a drive shaft. The method includes operating the gas turbine and a second compressor at a first steady load and a first steady drive shaft speed. The second compressor is rigidly coupled to the drive shaft. The method also includes changing a load of the second compressor by a known amount, and measuring a time required for the gas turbine to stabilize at a second steady load and a second steady drive shaft speed in response to the changed load of the second compressor.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 18 · Forward citations: 2.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    A method of testing a gas turbine, the gas turbine comprising a first compressor and an expansion turbine coupled by a drive shaft, said method comprising: operating the gas turbine and a second compressor at a first steady load and a first steady drive shaft speed, wherein the second compressor is rigidly coupled to the drive shaft; changing a load of the second compressor by a known amount; and measuring a time required for the gas turbine to stabilize at a second steady load and a second steady drive shaft speed in response to the changed load of the second compressor.

  2. Claim 2Depends on #1

    The method of claim 1 , further comprising: monitoring at least one safety limit; and ending the test if the at least one safety limit is exceeded.

  3. Claim 3Depends on #1

    The method of claim 1 , wherein said changing the load of the second compres

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (2 of 2 total)

References Cited — Backward Prior Art (18)

PatentTitleYearCitations
US 3,598,208 ALiquid brake dynamometer197119
US 6,164,057 AGas turbine generator having reserve capacity controller200075
US 2002190695 A1Turbogenerator with electrical brake—70
US 2003011199 A1Method and operational strategy for controlling variable stator vanes of a gas turbine power generator compressor component during under-frequency events—36
US 2006132993 A1Wind farm power ramp rate control system and method—60
US 2007271929 A1Method for gas turbine operation during under-frequency operation through use of air extraction—27
US 2009160187 A1Control system and method for operating a wind farm in a balanced state—100
US 2009223307 A1Measurement method for brakes in wind turbines—11
US 2011048119 A1Mechanical drive train for testing full scale compressor rigs and gas turbines—18
EP 2,378,085 A2Automatic system and method for monitoring the primary frequency response contribution in a turbo generator—6
US 8,076,789 B2System and method for controlling wind turbine power output201124
US 8,191,410 B2Mechanical drive train for testing full scale compressor rigs and gas turbines201213
US 8,452,515 B2System and method for simulating a gas turbine compressor201338
US 2013282195 A1Power plant operation enhancement—20
US 8,604,822 B2Methods and apparatus for testing electric power devices20137
US 2014260293 A1Systems and methods of droop response control of turbines—24
US 2015121872 A1Steam Turbine Power Plant and Method for Activating Steam Turbine Power Plant—8
US 2015177106 A1System and method for testing a gas turbine—7