Method and apparatus for testing a tubular annular seal
Abstract
The present invention provides an apparatus and method for testing a wellbore, and to an apparatus and method to efficiently and effectively test the annular seal of a tubular string positioned within a wellbore. More specifically, the cement seal between a casing string and a wellbore is tested to assure there is no contamination of groundwater or between different geologic formations. An additional aspect of the present invention is to provide a testing assembly comprising a frangible body and a tool body, the tool body providing a passageway to the annular seal when the frangible body is drilled out. In one particular embodiment, the frangible body initially forms an encapsulated bore that aligns with the passageway.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 11 · Forward citations: 3.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A downhole casing assembly for testing the cement integrity of a targeted annular seal of a wellbore, comprising: a testing assembly body for positioning within a tubular string of the wellbore, the testing assembly body having an interior surface defining a cavity and at least one aperture extending through the body to an exterior surface; a frangible body positioned within the cavity and comprising material adapted to seal the at least one aperture; and wherein a passageway is created between the cavity and the exterior surface of the testing assembly when the frangible body is substantially
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (3 of 3 total)
References Cited — Backward Prior Art (11)
Non-Patent Literature (4)
- "American Petroleum Institute. API: Recommended Practice for Performance Testing of Cementing Float Equipment," API Publishing, 2000, pp. 1-7.
- King, "Chapter 3: Cementing," George E King Consulting, retrieved from http://gekengineering.com/Downloads/Free-Downloads/Cementing-Chapter-3.pdf, last modified Jun. 11, 2014, 22 pages.
- King, “Chapter 3: Cementing,” George E King Consulting, retrieved from http://gekengineering.com/Downloads/Free—Downloads/Cementing—Chapter—3.pdf, last modified Jun. 11, 2014, 22 pages.
- Welge, "Testing Oil and Gas Wells for Water Shutoff with Formation Tester: California Division of Oil and Gas Manual No. M06," California Division of Oil and Gas, 1978, pp. 1-21.