Method of handling a gas influx in a riser
Abstract
A method of operating a system for handling an influx of gas into a marine riser during the drilling of a well bore includes the steps of operating a first riser closure apparatus to close the riser at a first point above a flow spool provided in the riser, there being a riser gas handling line extending from the riser at the flow spool to a riser gas handling manifold, operating a second riser closure apparatus to close the riser at a second point below the flow spool, pumping fluid into an inlet line which extends into the riser at a point above the second point but below the flow spool, and operating a choke provided in the riser gas handling manifold to maintain the pressure in the inlet line or the riser at a substantially constant pressure.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 13.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of operating a system for handling an influx of gas into a marine riser during the drilling of a well bore, the method including the steps of: operating a first riser closure apparatus to close the riser at a first point above a flow spool provided in the riser, there being a riser gas handling line extending from the riser at the flow spool to a riser gas handling manifold; operating a second riser closure apparatus to close the riser at a second point below the flow spool so as to form a volume in the riser between the first riser closure apparatus and the second riser closure appar
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (13 of 13 total)
References Cited — Backward Prior Art (50)
Non-Patent Literature (1)
- U.S. Appl. No. 14/384,619, filed Sep. 11, 2014.