Patents
US 9,605,430 B2#22199572 Most CitedActiveUnited States (USPTO)Utility

Tape spring retractable deployable structure and method

5Forward Citations (#22199572 Global)
0.6/yrCitation Velocity (#14444029 Global)
1.23Citation PageRank (#31041440 Global)
17Prior Art Cited
2Claims (1 Indep. · 1 Dep.)
0Drawings / Sheets

Abstract

A retractable tape spring in-building method for a deployable structure comprising a main tape spring having an axis of deployment and of refurling substantially parallel to an unfurled axis X and comprising two ends, a secondary tape spring comprising two ends and a winding mandrel carried by a shaft parallel to an axis Z perpendicular to the axis X, the main tape spring being wound around the mandrel, a first end of the main tape spring being fixed to the mandrel, the method comprising the following steps: fixing a first end of the secondary tape spring a predefined distance away from a second end of the main tape spring, fixing a second end of the secondary tape spring on the mandrel. A deployable structure comprising a tape spring for a flexible structure is also provided.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 17 · Forward citations: 5.

Claims (2 — 1 Independent, 1 Dependent)

  1. Claim 1Independent Claim

    A retractable tape spring in-building method for a deployable structure, comprising a main tape spring extending in a deployed position along an axis X and comprising two ends, a secondary tape spring comprising two ends and a winding mandrel carried by a shaft along an axis Z perpendicular to the axis X, the main tape spring being wound around the mandrel, a first end of the main tape spring being fixed to the mandrel, the method comprising the following steps: fixing a first end of the secondary tape spring to the main tape spring spaced from the first end of the main tape spring, fixing a s

  2. Claim 2Depends on #1

    The retractable in-building method according to claim 1 , further comprising the following steps: simultane

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗