Method and system for the production of reinforcing dowel baskets for contracting-expanding joints
Abstract
Systems and methods for producing dowel baskets from dowel side frames and transverse dowel rods. The dowel side frames are introduced at a top location of the production system, where there is initially introduced a first dowel rod and subsequently, with successive stepwise advancements, the remaining dowel rods are introduced. The dowel side frames with the dowel rods advance on guides that may rotate the dowel side frames relative to the axes of the longitudinal wires so as to impart a desired inclination angle φ relative to the rods. In following, with continuous stepwise advancements, the dowel rods are alternately welded, each to one of the opposed dowel side frames. Transverse wires are welded on the longitudinal wires to impart rigidity to the dowel basket. Subsequently, mass-produced dowel baskets may be stacked in groups.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 19 · Forward citations: 4.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A dowel basket production system comprising: entry guides configured to guide dowel side components; a first carrier, said first carrier having a first gripper configured to grasp a dowel rod of a dowel basket; a dowel rod feeding mechanism; a second carrier configured to push a semi-finished product towards welding; said second carrier having a second-carrier gripper; rotation guides configured to rotate dowel side components to have inclination relative to dowel rods; welding heads configured to weld dowel rods in an alternate manner to dowel side components whereby each dowel rod is welded
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (4 of 4 total)
References Cited — Backward Prior Art (19)
Non-Patent Literature (1)
- PCT-ISR search report and written opinion from priority PCT applicationPCT/IB2012/056797, dated Mar. 7, 2013 (in English).