Compositions and systems for combatting lost circulation and methods
Abstract
A method of servicing a wellbore in a subterranean formation comprising placing a first stream comprising a dilute solution of a metal acrylate into a lost circulation zone in the subterranean formation; placing a second stream comprising an activator into the lost circulation zone; and forming a lost circulation material upon contacting of the metal acrylate and the activator, wherein the lost circulation material forms in from about 0 to about 60 minutes. A method of servicing a wellbore in a subterranean formation comprising placing a composition comprising a dilute solution of a cross-linkable material and an encapsulated activator into a lost circulation zone in the subterranean formation; and allowing the composition to set.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 6.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of servicing a wellbore in a subterranean formation comprising: introducing a first component of a lost circulation combating composition within a drilling fluid, wherein the first component comprises a gellable composition in an amount from about 0.2 weight percent (wt. %) to about 30 wt. % of the lost circulation combating composition and the drilling fluid is circulated through the wellbore during drilling operations; introducing a second component of the lost circulation combating composition into the wellbore via a flowpath separate from the flowpath by which the drilling fluid i
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (6 of 6 total)
References Cited — Backward Prior Art (50)
Non-Patent Literature (5)
- Advisory Action dated Jul. 17, 2012 (3 pages), U.S. Appl. No. 12/621,329, filed Nov. 18, 2009.
- Advisory Action dated Mar. 18, 2013 (3 pages), U.S. Appl. No. 12/621,329, filed Nov. 18, 2009.
- Baroid Fluid Services brochure entitled "FlexPlug® service-for curing lost circulation, improving wellbore pressure containment and drilling ahead," Apr. 2008, 4 pages, Halliburton.
- Baroid Fluid Services brochure entitled "FUSE-IT(TM)-lost circulation treatment," May 2006, 2 pages, Halliburton.
- Baroid Fluid Services brochure entitled "FUSE-IT™-lost circulation treatment," May 2006, 2 pages, Halliburton.