Exploring the impact of changing project parameters on the likely delivery date of a project

3Forward Citations (#34131169 Global)
0.3/yrCitation Velocity (#25901023 Global)
0.94Citation PageRank (#45701256 Global)
50Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A user may be allowed to specify a change in one or more parameter data associated with the project, the one or more parameter data used previously to compute a probability distribution of completion time of the project. The probability distribution of completion time of the project may be recomputed based on the change. The recomputed probability distribution of the completion time of the project may be presented. An option to save the recomputed probability distribution may be provided. An option may be provided to specify another change in one or more parameter data associated with the project and repeat the recomputing and the presenting procedures based on another change in one or more parameter data associated with the project.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 3.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method of exploring an impact of changing project parameters on a likely delivery date of a project, comprising: allowing a user to specify a change in one or more parameter data associated with the project, the one or more parameter data used previously to compute a probability distribution of completion time of the project; recomputing the probability distribution of completion time of the project based on the change, the probability distribution recomputed by a combination of machine learning and stochastic simulation, wherein the machine learning comprises training a machine learning alg

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (50)

PatentTitleYearCitations
US 6,381,580 B1Automatic planning and cueing system and method2002106
US 2002082889 A1System and method for project management and assessment—160
US 6,415,259 B1Automatic work progress tracking and optimizing engine for a telecommunications customer care and billing system2002227
US 2002143601 A1Dynamic assignment of maintenance tasks to maintenance personnel—42
US 6,519,763 B1Time management and task completion and prediction software2003322
US 2003229618 A1System and method for project tracking and reporting—35
US 2004111306 A1Project assessment system and method—44
US 2004148209 A1System and method for producing an infrastructure project estimate for information technology—55
US 6,816,819 B1Graphical method and system for modeling and estimating construction parameters200494
US 2005021384 A1Capacity planning method and system with approved accuracy and confidence indication—60
US 2005114829 A1Facilitating the process of designing and developing a project—655
US 2005234758 A1Task progress management method, task progress management device and program—37
US 6,966,061 B1System and method for managing initiative delivery process200542
US 2006044307 A1System and method for visually representing project metrics on 3-dimensional building models—342
US 7,062,449 B1Method and apparatus for planning and monitoring multiple tasks based on user defined criteria and predictive ability and for automatically detecting task related work200686
WO 2006/119437 A2Method and system for managing project work using bayesian inference—17
US 2007168918 A1Software Development Planning and Management System—85
US 2007260505 A1Method and apparatus for planning and monitoring multiple tasks based on user defined criteria and predictive ability—13
US 2008015871 A1Varr system—108
US 7,324,954 B2System and method for organizational risk based on personnel planning factors200841
US 2008082388 A1Project management method and system—39
US 7,366,680 B1Project management system and method for assessing relationships between current and historical projects200840
US 2008141214 A1Method and system for comparative community based analytics—17
US 2008154821 A1Collaborative Predictive Model Building—84
US 7,398,510 B2Estimating software project requirements for resolving defect backlogs200812
US 2008221946 A1Method and system for evaluating and summarizing weekly project progress—52
US 2008243575 A1System and Method for Dynamically Allocating Human Resources to a Project Plan—35

Non-Patent Literature (5)

  • Cantor M., "Calculating and Improving ROI in Software and System Programs", Communications of the ACM, Sep. 2011, vol. 54, No. 9, pp. 121-130.
  • Curtis B. et al., "The Case for Quantitative Process Management" IEEE Software (Apr. 2008) pp. 24-29.
  • Curtis B. et al., "The Case for Quantitative Process Management", IEEE Software, 2008, pp. 24-29. (previously supplied).
  • Disclosed Anonymously, Method for an uncertainty principle of software release determinism, Mar. 19, 2003, ip.com-No. IBM000011850D.
  • FogBugz, FogBugz Features: Manage Software Projects, Copyright 2000-2013, Fog Creek Software, 55 Broadway, 25th Floor, New York City, NY 10006, pp. 1-6, http://www.fogcreek.com/fogbugz/features/project-management.html.