Apparatus and method for preventing tubing casing annulus pressure communication
Abstract
A method of installation of a completion assembly apparatus into a wellbore with a liner hangar packer includes introducing the completion assembly apparatus into the wellbore, where the hybrid sealing assembly couples to the polished bore receiver assembly such that the hybrid sealing assembly is not operable to move laterally within the polished bore receiver assembly, positioning the completion assembly apparatus such that the completion assembly apparatus couples with the liner hangar packer, which establishes fluid communication between the polished bore receiver assembly and a portion of the wellbore downhole from the liner hanger packer, and operating the completion assembly apparatus such that the hybrid sealing assembly decouples from the polished bore receiver assembly such that the hybrid sealing assembly is operable to move laterally within the polished bore receiver assembly. The hybrid sealing assembly includes an unswollen swellable packer operable to swell upon exposure to a swelling material.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 24 · Forward citations: 4.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of installation of a completion assembly apparatus into a wellbore with a liner hangar packer for the production of a hydrocarbon-bearing fluid, the method comprising the steps of: introducing the completion assembly apparatus into the wellbore, where the completion assembly apparatus includes a polished bore receiver assembly and a hybrid sealing assembly, where the hybrid sealing assembly couples to the polished bore receiver assembly such that the hybrid sealing assembly is not operable to move laterally within the polished bore receiver assembly; positioning the completion assembl
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (4 of 4 total)
References Cited — Backward Prior Art (24)
Non-Patent Literature (2)
- International Search Report and Written Opinion for related PCT application PCT/US2015/039666 dated Apr. 13, 2016.
- Robert Brooks et al., "Preventing Annular Gas Flow in Conjunction with 2 Stage Cementing," SPE 116447; SPE International Asia Pacific Oil & Gas Conference and Exhibition Perth, Australia; Oct. 20-22, 2008; 1 page.