Reorder-buffer-based dynamic checkpointing for rename table rebuilding
Abstract
Out-of-order CPUs, devices and methods diminish the time penalty from stalling the pipe to rebuild a rename table, such as due to a misprediction. A microprocessor can include a pipe that has a decoder, a dispatcher, and at least one execution unit. A rename table stores rename data, and a check-point table (“CPT”) stores rename data received from the dispatcher. A Re-Order Buffer (“ROB”) stores ROB data, and has a dynamic mapping relationship with the CPT. If the rename table is flushed, such as due to a misprediction, the rename table is rebuilt at least in part by concurrent copying of rename data stored in the CPT, in coordination with walking the ROB.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 22 · Forward citations: 0.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A microprocessor, comprising: a decoder for decoding an instruction into micro-operations; an execution unit for executing the micro-operations; a renamer for generating rename data according to the micro-operations; a rename table for storing the rename data, wherein the rename table is configured to flush the rename data from the rename table; a re-order buffer having re-order buffer entries for storing re-order buffer data generated from the micro-operations and a retire pointer pointing to a variable one of the re-order buffer entries, the re-order buffer data including rebuild rename data
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (22)
Non-Patent Literature (1)
- Andrew Hilton,"CPROB: Checkpoint Processing with Opportunistic Minimal Recovery", Sep. 18, 2009,Appears in Proccedings of PACT, pp. 1-2.