Patents
US 9,416,620 B2#33659925 Most CitedActiveUnited States (USPTO)Utility

Cement pulsation for subsea wellbore

3Forward Citations (#33659925 Global)
0.3/yrCitation Velocity (#25873098 Global)
1.02Citation PageRank (#40786166 Global)
20Prior Art Cited
2Claims (1 Indep. · 1 Dep.)
0Drawings / Sheets

Abstract

A method for cementing a tubular string into a wellbore from a drilling unit includes: running the tubular string into the wellbore using a workstring; hanging the tubular string from a wellhead or from a lower portion of a casing string set in the wellbore; and pumping cement slurry through the workstring and tubular string and into an annulus formed between the tubular string and the wellbore. The method further includes, during thickening of the cement slurry: circulating a liquid or mud through a loop closed by a seal engaged with an outer surface of the workstring, the closed loop being in fluid communication with the annulus, and periodically choking the liquid or mud, thereby pulsing the cement slurry.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 20 · Forward citations: 3.

Claims (2 — 1 Independent, 1 Dependent)

  1. Claim 1Independent Claim

    A method for cementing a tubular string into a wellbore from a drilling unit, comprising: running the tubular string into the wellbore using a workstring; hanging the tubular string from a wellhead or from a lower portion of a casing string set in the wellbore; pumping cement slurry through the workstring and tubular string and into an annulus formed between the tubular string and the wellbore; and during thickening of the cement slurry: circulating a liquid or mud through a loop closed by a seal engaged with an outer surface of the workstring, the closed loop being in fluid communication with

  2. Claim 2Depends on #1

    The method of claim 1 , wherein the cement slurry is pulsated until the cement slurry has sufficiently thickened to prevent gas migr

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (20)

PatentTitleYearCitations
US 4,093,028 AMethods of use of cementitious materials and sonic or energy-carrying waves within subsurface formations197835
US 4,393,932 AMethod and apparatus for uniformly packing gravel around a well casing or liner198340
US 4,640,372 ADiverter including apparatus for breaking up large pieces of formation carried to the surface by the drilling mud198731
US 4,653,587 AMethod and apparatus for the sonic cementing of wells in porous formations198745
US 5,361,837 AMethod for preventing annular fluid flow using tube waves199429
US 5,377,753 AMethod and apparatus to improve the displacement of drilling fluid by cement slurries during primary and remedial cementing operations, to improve cement bond logs and to reduce or eliminate gas migration problems199530
US 5,439,290 AFluid flow conduit vibrator and method199512
US 6,053,245 AMethod for monitoring the setting of well cement200036
US 7,013,997 B2Methods and apparatus for cementing drill strings in place for one pass drilling and completion of oil and gas wells200631
US 2008271896 A1Device in Connection with Heave Compensation—30
US 2009154282 A1Semiconductor device—12
US 2010044032 A1Method for completion, maintenance and stimulation of oil and gas wells—14
US 7,997,345 B2Universal marine diverter converter201140
US 8,047,282 B2Methods of sonically activating cement compositions201120
US 8,347,982 B2System and method for managing heave pressure from a floating rig201329
US 8,424,605 B1Methods and devices for casing and cementing well bores201316
US 2013118752 A1Managed pressure cementing—132
US 2014196905 A1Downhole vibratory apparatus—18
US 8,973,674 B2Drilling system and method of operating a drilling system20156
US 8,978,750 B2Signal operated isolation valve201514

Non-Patent Literature (5)

  • Active Heave Compensator, Ocean Drilling Program note, date unknown, 3 pages.
  • Aslakson, John, et al.-"Preventing Annular Flow After Cementing, One Pulse at a Time: Offshore Gulf of Mexico Cement Pulsation Field Results," SPE 94230, paper prepared for presentation at the 2005 SPE Production and Operations Symposium held in Oklahoma City, Oklahoma, Apr. 17-19, 2005, 8 pages.
  • Bourgoyne, Jr., Adam T., et al.-"A Review of Sustained Casing Pressure Occurring on the OCS," Louisiana State University study funded by the Minerals Management Services U.S. Department of the Interior, 2000, 61 pages.
  • Cooke, Jr., C.E, et al.-3-page summary of journal paper "Annular Pressure and Temperature Measurements Diagnose Cementing Operations," SPE-11416-PA, Journal of Petroleum Technology, vol. 36, Issue 12, 1984.
  • Cooke, Jr., C.E, et al.-3-page summary of journal paper "Field Measurements of Annular Pressure and Temperature During Primary Cementing," SPE-11206-PA, Journal of Petroleum Technology, vol. 35, Issue 8, 1983.