Patents
US 9,406,038 B2#13950044 Most CitedActiveUnited States (USPTO)Utility

GUI support for diagnosing and remediating problems that threaten on-time delivery of software and systems

8Forward Citations (#13950044 Global)
0.8/yrCitation Velocity (#9268127 Global)
1.43Citation PageRank (#24636934 Global)
50Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A graphical interface module may provide a set of graphical presentations comprising at least: a Likelihood of Delivery chart showing a probability distribution of predicted delivery dates; a Delivery Date Risk Trend chart showing how the completion time for the project predicted according to the Likelihood of Delivery chart has changed over time; and a Burndown chart that shows at least work-items of planned work for the project. Each of the Likelihood of Delivery chart, the Delivery Date Risk Trend chart, and the Burndown chart has a timeline axis.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 8.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A system for providing a graphical user interface support for diagnosing and remediating problems that threaten on-time delivery of a project, comprising: a processor; and a graphical interface module operable to execute on the processor and further operable to display a set of graphical presentations associated with a probability distribution for completion time for the project, the set of graphical presentations comprising at least: a Likelihood of Delivery chart showing a probability distribution of predicted delivery dates for the project; a Delivery Date Risk Trend chart showing how the c

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (50)

PatentTitleYearCitations
US 6,381,580 B1Automatic planning and cueing system and method2002106
US 2002082889 A1System and method for project management and assessment—160
US 6,415,259 B1Automatic work progress tracking and optimizing engine for a telecommunications customer care and billing system2002227
US 2002143601 A1Dynamic assignment of maintenance tasks to maintenance personnel—42
US 6,519,763 B1Time management and task completion and prediction software2003322
US 2003229618 A1System and method for project tracking and reporting—35
US 2004111306 A1Project assessment system and method—44
US 2004148209 A1System and method for producing an infrastructure project estimate for information technology—55
US 6,816,819 B1Graphical method and system for modeling and estimating construction parameters200494
US 2005021384 A1Capacity planning method and system with approved accuracy and confidence indication—60
US 2005114829 A1Facilitating the process of designing and developing a project—655
US 2005234758 A1Task progress management method, task progress management device and program—37
US 6,966,061 B1System and method for managing initiative delivery process200542
US 2006044307 A1System and method for visually representing project metrics on 3-dimensional building models—342
US 7,062,449 B1Method and apparatus for planning and monitoring multiple tasks based on user defined criteria and predictive ability and for automatically detecting task related work200686
WO 2006/119437 A2Method and system for managing project work using bayesian inference—17
US 2007168918 A1Software Development Planning and Management System—85
US 2007260505 A1Method and apparatus for planning and monitoring multiple tasks based on user defined criteria and predictive ability—13
US 2008015871 A1Varr system—108
US 7,324,954 B2System and method for organizational risk based on personnel planning factors200841
US 2008082388 A1Project management method and system—39
US 7,366,680 B1Project management system and method for assessing relationships between current and historical projects200840

Non-Patent Literature (5)

  • Cantor M., "Calculating and Improving ROI in Software and System Programs", Communications of the ACM, Sep. 2011, vol. 54, No. 9, pp. 121-130.
  • Curtis B. et al., "The Case for Quantitative Process Management" IEEE Software (Apr. 2008) pp. 24-29.
  • Curtis B. et al., "The Case for Quantitative Process Management", IEEE Software, 2008, pp. 24-29. (previously supplied).
  • Disclosed Anonymously, Method for an uncertainty principle of software release determinism, Mar. 19, 2003, ip.com-No. IBM000011850D.
  • FogBugz, FogBugz Features: Manage Software Projects, Copyright 2000-2013, Fog Creek Software, 55 Broadway, 25th Floor, New York City, NY 10006, pp. 1-6, http://www.fogcreek.com/fogbugz/features/project-management.html.