Triple activity drilling ship
Abstract
A triple activity drilling ship may be provided with two separate drilling centers, each including drilling apparatus. In addition, a trolley that is capable of supporting tubulars may be positioned between a first position within one of said drilling centers and a second position outside that drilling center. As a result, the trolley may be used to hold assembled tubulars while other activities are ongoing in one or more of the drilling centers.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 15 · Forward citations: 0.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A method comprising: making and connecting a conductor on a ship while the ship is en route to a drilling site and before the ship is over the drilling site; extending said conductor below said ship before the ship is over the drilling site and while en route to said site; running a marine riser and blowout preventer into the sea; and refraining from running the marine riser and blowout preventer when said conductor is in contact with the seabed floor.
- Claim 2Depends on #1
The method of claim 1 including assembling the blowout preventer and riser before completing dynamic positioning of said ship.
- Claim 3Depends on #1
The method of claim 1 including assembling a casing before completing dynamic positioning.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗