Fluid communication with an earth formation through cement
Abstract
A well system can include a well tool with a retarder chemical. The retarder chemical is released from the well tool into an annulus and retards setting of cement therein. A method of retarding setting of cement at a location in an annulus can include releasing a retarder chemical from a well tool connected in a casing string, after the cement is placed in the annulus. A well tool can include a valve that controls fluid communication via a port between an exterior of the tool and a flow passage extending through the tool, an annular recess, and a dispersible annular exterior component received in the recess. Another well tool can include a valve that controls fluid communication between an exterior of the tool and a flow passage extending through the well tool, an internal chamber, and a retarder chemical in the chamber.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 6 · Forward citations: 6.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A well system, comprising: a well tool including a retarder chemical, and casing connectors at opposite ends of the well tool; and the retarder chemical is released from the well tool into an annulus surrounding the well tool and retards setting of a cement in the annulus, wherein the retarder chemical is released from an exterior component of the well tool, wherein the exterior component is exposed to the cement, and wherein the retarder chemical leaches from the exterior component.
- Claim 2Depends on #1
The well system of claim 1 , wherein the retarder chemical is released from an exterior of the well tool.
- Claim 3Depends on #1
The well system of claim 1 , wherein the exterior component dissolves in response to exposure to the cement.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (6 of 6 total)
References Cited — Backward Prior Art (6)
Non-Patent Literature (1)
- Halliburton Energy Services, Inc.; "Retarders", catalog listing materials, dated Apr. 7, 2015, 1 page.