RRC messages and procedures
Abstract
A method and apparatus for radio resource control (RRC) messaging. A method in a wireless communication system includes receiving, at a wireless transmit/receive unit (WTRU) an RRC change command including a plurality of commands from a Node B and receiving, at the Node B, an RRC change response from the WTRU, wherein the RRC change command includes a command for performing a measurement gap configuration procedure and a command for performing a measurement gap activation procedure.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 15 · Forward citations: 2.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A method for use in a wireless communication system, the method comprising: receiving, at a wireless transmit/receive unit (WTRU) a radio resource control (RRC) change message including a plurality of information element (IE) values from a Node B; receiving, at the Node B, an RRC change response from the WTRU; and wherein the RRC change message includes an IE indicative of performing a measurement gap configuration procedure and an IE indicative of performing a measurement gap activation procedure.
- Claim 2Depends on #1
The method of claim 1 , wherein the RRC change message includes a plurality of measurement gap parameters.
- Claim 3Depends on #2
The method of claim 2 , wherein the measurement gap parameters are combined into a common set.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (2 of 2 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 2016205582 A1 | Rrc messages and procedures | — | 1 |
| US 10,237,853 B2 | RRC messages and procedures | 2019 | 0 |
References Cited — Backward Prior Art (15)
Non-Patent Literature (5)
- Ericsson, "Idle Gaps for Handover Measurements in E-UTRAN," 3GPP TSG-RAN WG2 (Radio) Meeting #54, R2-062134 (Aug. 28-Sep. 1, 2006).
- Ericsson, "Idle Gaps for Handover Measurements in E-UTRAN,"3GPP TSG-RAN WG2 (Radio) Meeting #54, R2-062134 (Aug.28-Sep. 1, 2006).
- Huawei, "Measurement Gap Scheduling in HO Procedure in LTE," 3GPP TSG RAN2 #52, R2-060860 (Mar. 27-31, 2006).
- Huawei, "Measurement Gap Scheduling in HO Procedure in LTE,"3GPP TSG RAN2#52, R-2060860 (Mar. 27-31, 2006).
- Nokia Siemens Networks et al., "Measurement Gap Creation," 3GPP TSG-RAN WG2 Meeting #58, R2-071728, Kobe, Japan (May 7-11, 2007).