Patents
US 9,277,342 B2#61974334 Most CitedActiveUnited States (USPTO)Utility

Method and device for testing a loudspeaker arrangement

1Forward Citations (#61974334 Global)
0.1/yrCitation Velocity (#46410717 Global)
0.74Citation PageRank (#61974334 Global)
7Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A loudspeaker arrangement includes a loudspeaker and a trigger circuit for electrically triggering the loudspeaker. The loudspeaker has a loudspeaker diaphragm for generating an acoustic signal. A digital pulse test signal is applied to the loudspeaker via the trigger circuit during a respective test sequence, the digital pulse test signal having a duty cycle that is predetermined to change such that the duty cycle increases over a plurality of periods of the test sequence at the beginning of the test sequence, and the duty cycle decreases over a plurality of periods of the test sequence at the end of the test sequence. During the respective test sequence, a measurement variable, representative of a voltage drop on a reference circuit connected in series to the loudspeaker, is detected, and the loudspeaker arrangement is classified as functional on the basis of a comparison of the measurement variable and a predetermined reference value.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 7 · Forward citations: 1.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method for testing a loudspeaker arrangement ( 10 ) having a loudspeaker ( 20 ) that has a loudspeaker membrane configured to generate an acoustic signal, and an actuation circuit ( 30 ) configured to electrically actuate the loudspeaker ( 20 ), the method comprising: applying, by the actuation circuit ( 30 ), a digital pulse test signal (P) with a predetermined changing duty cycle to the loudspeaker ( 20 ) during a respective test sequence duration (TS), the duty cycle being predetermined to change such that, at the start of the test sequence duration (TS), the duty cycle increases over a p

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (1 of 1 total)