Resource cost optimization system, method, and program
Abstract
Apparatus and method use a Markov decision process (MDP) to reduce the cost of variations in electric power usage. The user notifies a power company of a predicted value for a period. The period is divided into subsections. For each subsection, on the basis of a MDP including a state that depends on an electric power usage amount error, charge amount, and set target, the amount of charging and discharging of a storage battery as an action at any given time is optimally decided depending on the electric power usage amount error, charge amount, time, and set target at that time. A predetermined time in a subsection is a target setting time, at which a future target is further set as the action. The action includes deciding the charging and discharging amount in that subsection and deciding a future target in a subsection whose target should be set.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 16 · Forward citations: 2.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A computer implemented method for generating a policy for optimizing a cost of a resource under a predetermined cost structure, the method comprising: storing, in a computer-readable medium, an error distribution that indicates a deviation of an amount of usage from a predicted value referred to as usage amount error, a characteristic of a storage battery configured to store or release the resource, wherein the characteristic includes an amount of the resource in the storage battery, and the cost structure; calculating, using a computer processor processing a Markov decision process, an expect
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (2 of 2 total)
References Cited — Backward Prior Art (16)
Non-Patent Literature (5)
- Cheung et al., "Markov Decision Process (MDP) Framework for Optimizing Software on Mobile Phones", EMSOFT '09 Proceedings of the seventh ACM International Conference on Embedded Software, pp. 11-20, 2009.
- Goez et al., "Stochastic Unit Commitment Problem," IBM Research Report RC24713 (W0812-119), Dec. 23, 2008.
- Nikovski et al., "Factored Markov Decision Process Models for Stochastic Unit Commitment," Technical Report TR2010-083, Mitsubishi Electric Research Laboratories, Inc., Oct. 2010.
- Qui et al., "Dynamic Power Management based on Continuous-Time Markov Decision Processes", Department of Electrical Engineering-Systems, University of Southern California, Los Angeles, California, 1999.
- Sundstom et al., "Optimization Methods to Plan the Charging of Electric Vehicle Fleets," Proc. of Int. Conf. on CCPE 2010, pp. 323-328.