Scheduling to maximize utilization preferred power sources (SMUPPS)
Abstract
A power utilization scheduling system and methods are disclosed. A prioritized energy consumption schedule is determined based on a prioritized energy consumption. A per-process energy consumption model is determined based on an energy consumption model, and an operation is scheduled based on the prioritized energy consumption schedule and the per-process energy consumption model.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 10 · Forward citations: 10.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for power utilization scheduling, the method comprising: determining a prioritized energy consumption schedule to utilize supplied energy supplied by at least one producer to maximize usage of a preferred energy source based on a prioritized energy consumption; determining a per-process energy consumption model based on an energy consumption model for each part in a list of parts for manufacturing; for each part in the list, prioritizing a manufacturing process using the per-process energy consumption model based on an available energy and an associated cost; and scheduling each manuf
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (10 of 10 total)
References Cited — Backward Prior Art (10)
Non-Patent Literature (1)
- International Search Report and Written Opinion of the International Searching Authority mailed on Feb. 21, 2012 for PCT Application No. PCT/US 11/53115 filed on Sep. 23, 2011-International Searching Authority-European Patent Office.