US 9,129,236 B2#12078733 Most CitedActiveUnited States (USPTO)Utility

Drill hole planning

9Forward Citations (#12078733 Global)
0.8/yrCitation Velocity (#9011226 Global)
1.71Citation PageRank (#18684800 Global)
40Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

Forming a sequence plan for a machine to travel to a series of specified locations is described. An initial cost table ( 414 ) and a pattern of locations ( 412 ) is inputted to a Sequential Ordering Problem (SOP) solver ( 402 ). The resulting sequence ( 410 ) is processed by a motion planner ( 404 ) to derive by a motion planning procedure a plan of machine motions through the sequence. A cost table update ( 408 ) is performed based on the motion plan, which is then used for another iteration of the SOP solver ( 402 ).

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 40 · Forward citations: 9.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method to operate a mobile autonomous drill, the method comprising: determining an initial version of a cost table of costs of travel by the mobile autonomous drill between one or more drill hole locations in a drilling pattern; inputting into a Sequential Ordering Problem (SOP) solver data reflecting the drill hole locations in the drilling pattern and the initial version of the cost table to derive, by a SOP solving procedure, a potentially optimal drilling sequence; inputting data reflecting the potentially optimal drilling sequence into a motion planner to derive, by a motion planning pr

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (40)

PatentTitleYearCitations
US 3,721,471 ADrill-and-blast module197351
US 3,877,373 ADrill-and-blast process197531
US 3,896,885 ASystem for automatically aligning and/or moving in a parallel movement path a guide seating structure adapted for guiding the movement of a tool mounted thereon197530
US 4,113,033 AMethod and arrangement for positioning a working tool to a predetermined direction and/or a predetermined point197834
US 4,230,189 ADrilled hole end adjusting arrangement198025
US 4,501,199 AAutomatically controlled rock drilling apparatus198535
US 4,639,868 AControl method for drilling apparatus which makes use of a final drilling pattern transformed from primary and secondary patterns198749
US 5,200,677 AMethod and apparatus for controlling positioning means199323
US 5,533,841 AApparatus and method of drilling199625
US 5,805,452 ASystem and method for materials process control199853
US 5,913,199 AProcess and system for automatic, computer-system-supported optimisation199918
US 6,495,791 B2Method and subsystem for generating a trajectory to be followed by a motor-driven stage when processing microstructures at a laser-processing site200249
US 2004108110 A1Method and system for accessing subterranean deposits from the surface and tools therefor—88
US 6,772,105 B1Blasting method200450
US 6,792,363 B1System and method for trajectory optimization using adaptive navigation performance estimation200451
US 2004216922 A1Method for controlling a drilling sequence, a rock drilling apparatus and a computer programme to form a drilling sequence—37
US 2004252288 A1Advanced applications for 3-D autoscanning lidar system—29
US 2005010385 A1Blasting method—15
US 6,957,707 B2Method for controlling a drilling sequence, a rock drilling apparatus and a computer programme to form a drilling sequence200539
US 2005283294 A1Method and apparatus for machine guidance at a work site—51
US 2006124360 A1Methods and apparatus for drilling, completing and configuring U-tube boreholes—75

Non-Patent Literature (5)

  • Dowd, P. A., and P. C. Dare-Bryan. "Planning, designing and optimising production using geostatistical simulation." Proceedings of the International Symposium on Orebody Modelling and Strategic Mine Planning: Uncertainty and Risk Management. Hyatt Regency, Perth. 2005.
  • G. Venter, "Particle swarm optimization," AIAA Journal, pp. 1583-1589, (2002), 10 pgs.
  • Iatha Krishna Sundar, Damodar Acharya, Blast schedule planning and shiftwise production scheduling of an opencast iron ore mine, Computers & Industrial Engineering, vol. 28, Issue 4, Oct. 1995, pp. 927-935, ISSN 0360-8352.
  • J.E. Everett, Computer aids for production systems management in iron ore mining, International Journal of Production Economics, vol. 110, Issues 1-2, Oct. 2007, pp. 213-223, ISSN 0925-5273.
  • Jerome Le Ny, "Performance Optimization for Unmanned Vehicle Systems," Thesis (Ph. D.)-Massachusetts Institute of Technology, Dept. of Aeronautics and Astronautics, pp. 2-5, 7-9, 11-13, 15-155 (2008).