Patents
US 9,080,440 B2#14002643 Most CitedActiveUnited States (USPTO)Utility

Proppant pillar placement in a fracture with high solid content fluid

8Forward Citations (#14002643 Global)
0.7/yrCitation Velocity (#10507313 Global)
1.35Citation PageRank (#26952567 Global)
50Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A method of placing proppant into a fracture formed in a subterranean formation from a wellbore is disclosed. The method comprises injecting through the wellbore a first treatment fluid to initiate the fracture in the subterranean formation; injecting through the wellbore a second treatment fluid comprising a particulate blend slurry made of proppant; the particulate blend comprising at least a first amount of particulates having a first average particle size between about 100 and 5000 μm and at least a second amount of particulates having a second average particle size between about three and twenty times smaller than the first average particle size; and forming with the particulate blend slurry a plurality of proppant-rich clusters spaced apart by proppant-free regions forming open channels.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 8.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method of placing proppant into a fracture formed in a subterranean formation from a wellbore, the method comprising: injecting through the wellbore a first treatment fluid to initiate the fracture in the subterranean formation; injecting through the wellbore a second treatment fluid comprising a sequence of two separate stages, a first stage comprising a particulate blend high solid content slurry comprising proppant; the particulate blend high solid content slurry comprising at least a first amount of particulates having a first average particle size—between about 100 and 5000 μm and at le

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (50)

PatentTitleYearCitations
US 2,193,775 AMethod of treating a well194072
US 2,513,944 AMethod and apparatus for completing a well195057
US RE24570 EPermeable concrete195827
US 2,905,245 ALiner packing method195961
US 3,362,475 AMethod of gravel packing a well and product formed thereby196869
US 3,434,540 ASand control method using a particulate pack with external and internal particle size distribution relationships196947
US 3,675,717 AMethod of gravel packing wells197275
US 3,887,474 AProcess for producing a filler for drilling mud197544
US 3,937,283 AFormation fracturing with stable foam1976355
US 4,051,900 APropping material for hydraulic fracturing197774
US 4,143,715 AMethod for bringing a well under control197959
US 4,387,769 AMethod for reducing the permeability of subterranean formations1983270
US 4,506,734 AFracturing fluid breaker system which is activated by fracture closure1985378
US 4,526,695 AComposition for reducing the permeability of subterranean formations1985168
US 4,606,407 AProgrammed gelation of polymers for oil reservoir permeability control198675
US 4,652,257 AMagnetically-localizable, polymerized lipid vesicles and method of disrupting same1987111
US 4,665,988 AMethod of preparation of variable permeability fill material for use in subterranean formations198793
US 4,670,166 APolymer article and its use for controlled introduction of reagent into a fluid198798
US 4,718,490 ACreation of multiple sequential hydraulic fractures via hydraulic fracturing combined with controlled pulse fracturing1988170
US 4,738,897 APolymer article and its use for controlled introduction of reagent into a fluid198863
US 4,785,884 AConsolidation of partially cured resin coated particulate material1988186
US 4,848,467 AFormation fracturing process1989185